1 |
29-Oct-2024 04:40 PM |
11-Nov-2024 04:30 PM |
12-Nov-2024 10:30 AM |
[Construction of Divisional Store Office Building of ED-II, Rajbagh at Bemina including Re-Construction of existing Store-Shed Truss Structure (Phase-I Works) under Capex Budget 2024-25 (Scheme Code PDDSS2022100075) ]
[ED-II/18 of 2024-25 Dated 28/10/24][2024_PDD_262702_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
2 |
29-Oct-2024 04:00 PM |
18-Nov-2024 02:00 PM |
19-Nov-2024 02:00 PM |
[LT Power supply to newly constructed BSNL USOF site at Gutiyar Baramulla of ESD Baramulla 1st.]
[EDB/97][2024_PDD_262621_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
3 |
29-Oct-2024 04:00 PM |
18-Nov-2024 02:00 PM |
19-Nov-2024 02:00 PM |
[LT Power supply to newly constructed BSNL USOF site at Fatehpora Baramulla of ESD Baramulla 1st.]
[EDB/96][2024_PDD_262618_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
4 |
29-Oct-2024 04:00 PM |
21-Nov-2024 03:00 PM |
22-Nov-2024 01:00 PM |
[Preventive, Routine and Break down maintenance of 132 KV Transmission Lines under the jurisdiction of TLMD-II Pampore]
[TLMD-II/14 of 2024-25][2024_PDD_262681_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-II Pampore |
5 |
29-Oct-2024 04:00 PM |
19-Nov-2024 01:00 PM |
19-Nov-2024 04:00 PM |
[Stabilization of 33kV Pulwama-Mitrigam Line for making it functional Under Scheme Evacuation of 04 No. Feeders from GIS Lassipora, PDDSS2021100184 UT Capex 2024-25]
[STD/PUL/15 OF 2024-25 DATED 29/10/2024][2024_PDD_262688_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
6 |
29-Oct-2024 04:00 PM |
21-Nov-2024 03:00 PM |
22-Nov-2024 01:00 PM |
[Preventive, Routine and Break down maintenance of 132/33KV Grid Stations under the jurisdiction of TLMD-II Pampore]
[TLMD-II/13 of 2024-25][2024_PDD_262667_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-II Pampore |
7 |
29-Oct-2024 04:00 PM |
18-Nov-2024 02:00 PM |
19-Nov-2024 02:00 PM |
[LT Power supply to newly constructed BSNL USOF site at Hajibal of ESD Baramulla 2nd.]
[EDB/98][2024_PDD_262637_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
8 |
29-Oct-2024 04:00 PM |
18-Nov-2024 02:00 PM |
19-Nov-2024 02:00 PM |
[Creation of 250kVA substaion at LIS Jabla Salamabad Khul under BADP programe of ESD Mohura.]
[EDB/93][2024_PDD_262606_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
9 |
29-Oct-2024 04:00 PM |
18-Nov-2024 02:00 PM |
19-Nov-2024 02:00 PM |
[LT Power supply to newly constructed BSNL USOF site at Gantamulla of ESD Baramulla 2nd.]
[EDB/99][2024_PDD_262640_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
10 |
29-Oct-2024 04:00 PM |
18-Nov-2024 02:00 PM |
19-Nov-2024 02:00 PM |
[Creation dedicated 100kVA substation for workshop Sub Division of Flood Mechanical Division Baramulla of ESD Baramulla 1st.]
[EDB/94][2024_PDD_262610_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
11 |
29-Oct-2024 04:00 PM |
18-Nov-2024 02:00 PM |
19-Nov-2024 02:00 PM |
[ LT Power supply to newly constructed BSNL USOF site at Fresthar of ESD Baramulla.]
[EDB/95][2024_PDD_262615_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
12 |
29-Oct-2024 03:10 PM |
18-Nov-2024 02:00 PM |
19-Nov-2024 03:00 PM |
[Supply and Installation of additional material required for Commissioning of 100 KVA 33/0.433 KVA Sub Station of WSS Sidiq Colony.]
[STDS/14 of 2024-25][2024_PDD_262662_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||STD-Sopore |
13 |
29-Oct-2024 03:00 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 02:00 PM |
[Upgradation of sub station 100kva to 250kva at Seri, and LT improvement at Kondhra UT Capex Budget]
[ED Doda/JPDCL/35 of 2024-25 ][2024_PDD_262638_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
14 |
29-Oct-2024 03:00 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 02:00 PM |
[Upgradation of sub station 100kva to 250kva Bhalara I, 25kva to 100kva Amira Nagar,16kva to 63kva Kurshari under UT Capex Budget]
[ ED Doda/JPDCL/34 of 2024-25 ][2024_PDD_262630_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
15 |
29-Oct-2024 12:30 PM |
19-Nov-2024 02:00 PM |
21-Nov-2024 02:00 PM |
[Stabilization of EHV Transmission Line infrastructure by way of replacing worn out/out lived conductor of 132kV Habbak Cheshmashahi Transmission Line at various locations/places]
[12/JKPTCL/TLMD-I/SGR/2024-25 Dated 29.10.2024][2024_PDD_262612_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-I Srinagar |
16 |
29-Oct-2024 10:00 AM |
12-Nov-2024 02:00 PM |
13-Nov-2024 12:00 PM |
[Supply Erection Testing and Commissioning for creation of 1X100 KVA Sub-station along with HTLT NW for construction of Tulip Garden Sanasar Ramban under the jurisdiction of ED Batote on turn key basis]
[e NIT 30 of 2024-25][2024_PDD_262498_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Batote |
17 |
29-Oct-2024 10:00 AM |
18-Nov-2024 02:00 PM |
19-Nov-2024 03:00 PM |
[Annual Rate Contract for repairs of 33/11KV Power Transformers (Damaged) under the jurisdiction of Sub Transmission Division Sopore for the Year 2024-25 or till next Rate Contract is finalized.]
[STDS/13 of 2024-25 ][2024_PDD_262564_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||STD-Sopore |
18 |
29-Oct-2024 09:00 AM |
18-Nov-2024 03:00 PM |
19-Nov-2024 01:00 PM |
[Construction of 33KV Bay at 132/33 KV Khellani Dedicated to Uni-Directional Khellani-Tunnel of Length 1.574 on NH-244]
[TLMD-III/UDH/ 14 of 2024-25 Dated-28-10-2024][2024_PDD_262544_1]
|
DC-PDD||CE-S and O Wing Jammu||CIRCLE I-Jammu||TLMD-III Uadhampur |
19 |
28-Oct-2024 06:00 PM |
18-Nov-2024 03:00 PM |
19-Nov-2024 02:00 PM |
[Fixing of Rate Contract for Maintenance/ Emergent nature of works of Distribution Network in respect of Electric Division -III Jammu for the Financial Year 2024-25 or till Tender for Financial Year 2025-26 is finalized]
[ED-III/Jammu/26A of 2024-25][2024_PDD_262497_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-III Jammu |
20 |
28-Oct-2024 05:00 PM |
18-Nov-2024 02:00 PM |
20-Nov-2024 02:00 PM |
[STABILIZATION OF 220KV D/C BISHNAH-HIRANAGAR TRANS. LINE BY WAY OF PROVIDING AND LAYING OF CRATES AT LOCATION NO. 120 DUE TO ITS VULNERABLE CONDITION.]
[TLMD-IV/J/15 of 2024-25 Dated 28-10-2024][2024_PDD_262520_1]
|
DC-PDD||CE-S and O Wing Jammu||CIRCLE II-Jammu||TLCD-II Jammu |
21 |
28-Oct-2024 05:00 PM |
18-Nov-2024 02:00 PM |
19-Nov-2024 02:00 PM |
[TLMD-III/UDH/13 Of 2024-25 ]
[TLMD-III/UDH/ 13 of 2024-25 Dated 28-10-2024][2024_PDD_262532_1]
|
DC-PDD||CE-S and O Wing Jammu||CIRCLE I-Jammu||TLMD-III Uadhampur |
22 |
28-Oct-2024 05:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 02:30 PM |
[Construction of new 11kv line for Hassan pora feeder from R/stn Shamsipora.]
[STB/23 of 2024-25 Dated 28.10.2024][2024_PDD_262471_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
23 |
28-Oct-2024 04:30 PM |
19-Nov-2024 02:00 PM |
20-Nov-2024 03:00 PM |
[System Strengthening of 220 kV D/C KPTL by way of several works of electrical nature at various locations of the Transmission Line]
[TLMD-IV/e-NIT/04 0F 2024-25][2024_PDD_262514_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-IV Pampore |
24 |
28-Oct-2024 04:15 PM |
19-Nov-2024 02:00 PM |
21-Nov-2024 02:00 PM |
[Replacement of old 132KV SF6 Hydraulic Circuit Breakers at 450MVA,220/132/33 KV Grid Substation Zainakote Srinagar]
[TLMD-IV/e-NIT/02 0F 2024-25][2024_PDD_262500_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-IV Pampore |
25 |
28-Oct-2024 03:00 PM |
16-Nov-2024 04:00 PM |
18-Nov-2024 11:00 AM |
[Replacement of Bare ACSR conductor by 11kv AB Cable at THQ 27 Tanghdar under Depost Contribution Scheme]
[e-NIT 18 of 2024-25][2024_PDD_262472_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
26 |
28-Oct-2024 02:30 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 36 of 2024-25]
[EDSbl 36 of 2024-25][2024_PDD_262479_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
27 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 20 of 2024-25]
[edsBL 20 OF 2024-25][2024_PDD_262392_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
28 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 35 of 2024-25]
[EDSbl 35 of 2024-25][2024_PDD_262443_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
29 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 34 of 2024-25]
[EDSbl 34 of 2024-25][2024_PDD_262442_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
30 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 33 of 2024-25]
[EDSbl 33 of 2024-25][2024_PDD_262441_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
31 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 28 of 2024-25]
[EDsbl 28 of 2024-25][2024_PDD_262412_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
32 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 27of 2024-25]
[EDSbl 27 of 2024-25][2024_PDD_262410_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
33 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 18 of 2024-25]
[EDSbl 18 of 2024-25 ][2024_PDD_262381_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
34 |
28-Oct-2024 02:00 PM |
18-Nov-2024 01:00 PM |
18-Nov-2024 04:00 PM |
[Stabilization of 33 KV Landoora Line Part 2nd under Scheme Augmentation of 33kV Lines New Lines PDDSS2021101363]
[STD/PUL/14 OF 2024-25 DATED 28/10/2024][2024_PDD_262454_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
35 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 19 2024-25]
[edsBL 19 OF 2024-25][2024_PDD_262384_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
36 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 21 of 2024-25]
[EDSbl 21 of 2024-25][2024_PDD_262401_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
37 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 32 of 2024-25]
[EDSbl 32 of 2024-25][2024_PDD_262440_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
38 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 30 of 2024-25]
[EDSbl 30 of 2024-25][2024_PDD_262437_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
39 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 31 of 2024-25]
[EDSbl 31 of 2024-25][2024_PDD_262438_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
40 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 29 of 2024-25 ]
[EDSbl 29 of 2024-25][2024_PDD_262434_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
41 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 26 of 2024-25]
[EDSbl 26 of 2024-25][2024_PDD_262408_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
42 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 25 of 2024-25]
[EDsbl 25 of 2024-25][2024_PDD_262406_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
43 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 24 of 2024-25]
[EDSbl 24 of 2024-25][2024_PDD_262404_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
44 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 2024-25]
[EDSbl 23 of 2024-25][2024_PDD_262403_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
45 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[EDSbl 22of 2024-25]
[EDSbl 22 of 2024-25][2024_PDD_262402_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
46 |
28-Oct-2024 02:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[ENIT 17 of 2024-25]
[EDSbl-17 OF 2024-25][2024_PDD_262377_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
47 |
28-Oct-2024 01:00 PM |
08-Nov-2024 11:00 AM |
08-Nov-2024 02:00 PM |
[REPLACEMENT OF WORN-OUT CONDUCTOR AND ROTTEN POLES AT VARIOUS LOCATIONS FOR ED SHOPIAN UNDER UT CAPEX]
[EDS/E-TENDER/31 OF 2024-25 DATED 28-10-2024][2024_PDD_262453_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
48 |
28-Oct-2024 10:00 AM |
07-Nov-2024 04:00 PM |
08-Nov-2024 12:00 PM |
[creation of power distribution network for rapid filtration plant Lachkhazana and creation of 100kva sub stn for wss Matta under JJM]
[enit no.42 of 2024][2024_PDD_262417_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||Ed-kishtwar |
49 |
25-Oct-2024 06:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[IMPROVEMENT OF 66KV SARNA-KATHUA AND 66KV SARNA - KEERIAN TAP LINE BY WAY OF INSERTION OF STEEL POLES AND REPLACEMENT OF CONDUCTOR]
[e-NIT/2024-25/07 Dated 25.10.2024][2024_PDD_262324_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||STD-III Kathua |
50 |
25-Oct-2024 06:00 PM |
13-Nov-2024 02:00 PM |
15-Nov-2024 02:00 PM |
[Stabilization_improvement of 33 KV Badampora Safapora Line of STD Ganderbal under Capex Budget]
[STD_GBL_e-NIT No 15 OF 2024-25 DATED 24-10-24][2024_PDD_262233_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||STD-Ganderbal |
51 |
25-Oct-2024 06:00 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[Shifting of 33KV Line R Stn Marh towards Gajansoo on Panther Cond on 13Mtr ST Pole Pole STDI JPDCL]
[e NIT 27 of 2024][2024_PDD_262257_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||STD-I Jammu |
52 |
25-Oct-2024 06:00 PM |
13-Nov-2024 02:00 PM |
15-Nov-2024 02:00 PM |
[Stabilization_improvement of 33 KV Potushai Ajar, Potushai Nadihal and Potushai Aloosa Line of STD Ganderbal under Capex Budget]
[STD_GBL_e-NIT No 16 OF 2024-25 DATED 25-10-24][2024_PDD_262238_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||STD-Ganderbal |
53 |
25-Oct-2024 05:45 PM |
16-Nov-2024 02:00 PM |
18-Nov-2024 02:00 PM |
[NIT FOR Insertion of D6 Type Tower between location No 95 and 96 of 220kv ZATL ]
[eNIT NO. TLMD-VI/08 OF 2024-25 DATED 25-10-2024][2024_PDD_262328_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-I Srinagar |
54 |
25-Oct-2024 05:00 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 02:00 PM |
[Shifting of 11 kv line coming under road alignment under PMGSY at Dansal to Assar also dismantling of existing 11kv line under the jurisdiction of JPDCL ED Doda ON FULL TURNKEY BASIS]
[ED Doda/JPDCL/33 of 2024-25][2024_PDD_262318_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
55 |
25-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation 63 KVA Substations for Plastic Waste Management Unit along with HT network at YK Pora and at Creation of 63kva substation along with HTLT for reliable power supply to Plastic Waste Management Unit at Vessu under District Capex 2024.]
[EDK/e-tender/23(03) of 2024-25][2024_PDD_262299_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
56 |
25-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Requirement of New 100 KVA Transformer Near Masjid Sharief Dalwach and LT Improvement Village Panzath Vanpora Panzath A under District Capex DDC Grants 2024-25.]
[EDK/e-tender/23(II) of 2024-25][2024_PDD_262290_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
57 |
25-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA Transformer LTHT New Colony Kewa and Requirement of new 63 KVA Transformer Manzmoo Trangtrehaji under District Capex DDC Grants 2024-25.]
[EDK/e-tender/23(01) of 2024-25][2024_PDD_262284_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
58 |
25-Oct-2024 05:00 PM |
08-Nov-2024 11:00 AM |
08-Nov-2024 02:00 PM |
[IMPROVEMENT OF HT/LT NETWORK AT VARIOUS LOCATIONS FOR ED SHOPIAN UNDER UT CAPEX]
[EDS/E-TENDER/30 OF 2024 DATED 25-10-2024][2024_PDD_262307_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
59 |
25-Oct-2024 05:00 PM |
07-Nov-2024 11:00 AM |
07-Nov-2024 02:00 PM |
[AUGMENTATION OF VARIOUS CRITICALLY OVERLOADED TRANSFORMERS UNDER UT CAPEX IN DISTRICT SHOPIAN]
[EDS/E-TENDER/29 OF 2024 DATED 25-10-2024][2024_PDD_262252_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
60 |
25-Oct-2024 05:00 PM |
07-Nov-2024 11:00 AM |
07-Nov-2024 02:00 PM |
[AUGMENTATION / CREATION ALONG WITH HT/LT NETWORK IN DISTRICT SHOPIAN UNDER UT CAPEX]
[EDS/E-TENDER/28 OF 2024-25 DATED 25-10-2024][2024_PDD_262248_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
61 |
25-Oct-2024 04:00 PM |
16-Nov-2024 04:00 PM |
18-Nov-2024 01:00 PM |
[Construction of 16 No 200 KVA 11 433KV Substation for providing of power supply to transit accommodations for Kashmiri Migrants at Zewan.]
[E NIT NO 047 OF ED-I][2024_PDD_262226_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
62 |
25-Oct-2024 04:00 PM |
14-Nov-2024 04:00 PM |
16-Nov-2024 01:00 PM |
[Installation of Street Lighting on 7 Mtr Long Octagonal Poles for beautification of town]
[EDG/V/104 OF 2024-25][2024_PDD_262279_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
63 |
25-Oct-2024 04:00 PM |
14-Nov-2024 04:00 PM |
16-Nov-2024 01:00 PM |
[Shifting/ Re-alignment of 11 KV Line at Semen Station Ranbirbagh Ganderbal. ]
[EDG/V/105 OF 2024-25][2024_PDD_262301_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
64 |
25-Oct-2024 03:00 PM |
06-Nov-2024 11:00 AM |
06-Nov-2024 02:00 PM |
[R AND M OF 9 NO. OF DIFFERENT DIFERRENT SUB-STATIONS AT VARIOUS LOCATIONS IN DISTRICT SHOPIAN UNDER PRI GRANTS]
[EDS/E-TENDER/27 OF 2024 DATED 25-10-2024][2024_PDD_262234_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
65 |
25-Oct-2024 11:05 AM |
07-Nov-2024 02:00 PM |
08-Nov-2024 01:00 PM |
[CREATION OF 1X63 KVA SUBSTATION ALONG WITH HT/LT NETWORK ATIRRIGATION PHALIANA RAJOURI IN SUBDIVISION RAJOURI-I UNDER DC WORKS.]
[EDR/38 of 2024-25 Dated 25.10.2024][2024_PDD_262210_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Rajouri |
66 |
24-Oct-2024 06:00 PM |
14-Nov-2024 02:00 PM |
16-Nov-2024 01:00 PM |
[Buffer Stock of Transformers at Block Level Block Harduaboora(Under DISTRICT CAPEX BUDGET -2024-25) ( BDC Grants)]
[E-NIT No.SSDT/28 of 2024-25,Dated 24/10/2024][2024_PDD_262078_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
67 |
24-Oct-2024 06:00 PM |
14-Nov-2024 02:00 PM |
16-Nov-2024 01:00 PM |
[Buffer Stock of Transformers at Block Level Block Wailoo (Under DISTRICT CAPEX BUDGET -2024-25) ( BDC Grants)]
[E-NIT No.SSDT/27 of 2024-25,Dated 23/10/2024][2024_PDD_262019_2]
|
DC-PDD||CE-M and RE Wing Kashmir |
68 |
24-Oct-2024 06:00 PM |
14-Nov-2024 02:00 PM |
16-Nov-2024 01:00 PM |
[Buffer Stock of Transformers at Block Level Block Tangmarg (Under DISTRICT CAPEX BUDGET -2024-25) ( BDC Grants)]
[E-NIT No.SSDT/28 of 2024-25,Dated 24/10/2024][2024_PDD_262078_4]
|
DC-PDD||CE-M and RE Wing Kashmir |
69 |
24-Oct-2024 06:00 PM |
14-Nov-2024 02:00 PM |
16-Nov-2024 01:00 PM |
[Buffer Stock of Transformers at Block Level Block Kunzer (Under DISTRICT CAPEX BUDGET -2024-25) ( BDC Grants)]
[E-NIT No.SSDT/28 of 2024-25,Dated 24/10/2024][2024_PDD_262078_3]
|
DC-PDD||CE-M and RE Wing Kashmir |
70 |
24-Oct-2024 06:00 PM |
14-Nov-2024 02:00 PM |
16-Nov-2024 01:00 PM |
[Buffer Stock of Transformers at Block Level Block Khaipora (Under DISTRICT CAPEX BUDGET -2024-25) ( BDC Grants)]
[E-NIT No.SSDT/28 of 2024-25,Dated 24/10/2024][2024_PDD_262078_2]
|
DC-PDD||CE-M and RE Wing Kashmir |
71 |
24-Oct-2024 06:00 PM |
14-Nov-2024 02:00 PM |
16-Nov-2024 01:00 PM |
[Buffer Stock of Transformers at Block Level Block Lalpora (Under DISTRICT CAPEX BUDGET -2024-25) ( BDC Grants)]
[E-NIT No.SSDT/27 of 2024-25,Dated 23/10/2024][2024_PDD_262019_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
72 |
24-Oct-2024 06:00 PM |
13-Nov-2024 02:00 PM |
15-Nov-2024 02:00 PM |
[Stabilization, improvement of 33 KV Alasteng Nagbal Line for STD Ganderbal under Capex Budget]
[ STD GBL 14 OF 2024-25 Dated 24-10-2024 ][2024_PDD_262018_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||STD-Ganderbal |
73 |
24-Oct-2024 06:00 PM |
14-Nov-2024 04:00 PM |
18-Nov-2024 02:00 PM |
[Rate Contract for Store Handling such as loading, un-loading and stacking of Damaged-Repaired-Fresh DT of different capacities ranging from 25KVA to 800KVA, besides other allied key material used for repair of damaged DTs at ECWD Jammu]
[ECWD-J-Store Handling-06 of 2024 dt 24-10-2024][2024_PDD_262134_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||Central Workshop Jammu |
74 |
24-Oct-2024 05:00 PM |
11-Nov-2024 01:00 PM |
12-Nov-2024 01:00 PM |
[Creation of 63Kva Substation along with HT LT Network for Plastic waste Mangement Plant at Kanjigund Batengoo]
[EDB/e-tender/ 69 of 2024-25 ][2024_PDD_262109_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
75 |
24-Oct-2024 05:00 PM |
11-Nov-2024 01:00 PM |
12-Nov-2024 01:00 PM |
[Provision of Substations for Platic Soild Waste Management Gramin at Thajiwara Kanelwan]
[EDB/e-tender/ 69 of 2024-25][2024_PDD_262046_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
76 |
24-Oct-2024 05:00 PM |
11-Nov-2024 01:00 PM |
12-Nov-2024 01:00 PM |
[Creation of 100 KVA Substation along with HTLT Network at Akura for providing of power supply tom Plastic Waste Management Unit at Akura]
[EDB/e-tender/ 69 of 2024-25][2024_PDD_262080_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
77 |
24-Oct-2024 05:00 PM |
11-Nov-2024 01:00 PM |
12-Nov-2024 01:00 PM |
[Improvement of LT Network at Itoo Mohalla Matipora]
[EDB/e-tender/ 69 of 2024-25][2024_PDD_262136_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
78 |
24-Oct-2024 05:00 PM |
11-Nov-2024 01:00 PM |
12-Nov-2024 01:00 PM |
[Provision of Substations for Platic Soild Waste Management Gramin at Hatigam Nowshara]
[EDB/e-tender/ 69 of 2024-25 ][2024_PDD_262072_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
79 |
24-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Creation of 63kva transformer along with HTLT line for Plastic Waste Management Unit at Turigam Behibagh under SBMG.]
[EDK/e-tender/22 of 2024-25][2024_PDD_262129_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
80 |
24-Oct-2024 05:00 PM |
11-Nov-2024 01:00 PM |
12-Nov-2024 01:00 PM |
[Providing of electric Line to GMS Arwani]
[EDB/e-tender/ 69 of 2024-25][2024_PDD_262119_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
81 |
24-Oct-2024 05:00 PM |
11-Nov-2024 01:00 PM |
12-Nov-2024 01:00 PM |
[Creation of 63 KVA Substation along with HT LT Network at RR Camp RH Canal Panjpora]
[EDB/e-tender/ 69 of 2024-25][2024_PDD_262101_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
82 |
24-Oct-2024 05:00 PM |
11-Nov-2024 01:00 PM |
12-Nov-2024 01:00 PM |
[Provision of Substations for Platic Soild Waste Management Gramin at Yanner]
[EDB/e-tender/ 69 of 2024-25][2024_PDD_262091_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
83 |
24-Oct-2024 04:00 PM |
14-Nov-2024 03:00 PM |
16-Nov-2024 03:00 PM |
[Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Installation of 25 KVA along erection of 11 KV Line on 9 mtr. ST poles, 30mm Sq ACSR Weasel LT on 8 mtr. ST pole for Bailing and Shredder machine at Seen Thakaran]
[ED/UDH/26 of 2024-25 Dated 24-10-2024][2024_PDD_262038_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
84 |
24-Oct-2024 04:00 PM |
12-Nov-2024 02:00 PM |
13-Nov-2024 02:00 PM |
[Creation of 63kVA dedicated substation in favor of Horticulture deptt. For pesticides labortary at Kreeri of ESD Wagoora ]
[EDB/92][2024_PDD_262044_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
85 |
24-Oct-2024 04:00 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 01:00 PM |
[Replacement of Worn Out Conductor and Rotten Poles for ED Ganderbal]
[EDG/V/100 OF 2024-25][2024_PDD_262045_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
86 |
24-Oct-2024 04:00 PM |
14-Nov-2024 03:00 PM |
16-Nov-2024 03:00 PM |
[Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Boundary Wall Fencing Pathways Entry Gate Borewell Beautification and Provision of Solar Panels Electrification at Mand Udhampur on turnkey basis. ]
[ED/Udh/27 of 2024-25 dt. 24-10-2024][2024_PDD_262092_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
87 |
24-Oct-2024 04:00 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 01:00 PM |
[Creation of 63 KVA Feasible Substation at Dard Mohalla W No 4 Kachnambal B]
[EDG/V/102 OF 2024-25][2024_PDD_262105_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
88 |
24-Oct-2024 04:00 PM |
30-Oct-2024 04:00 PM |
30-Oct-2024 05:00 PM |
[Fixing of rates for hire]
[EDBpr 29 of 2024-25][2024_PDD_262085_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
89 |
24-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 02:00 PM |
[Creation 4x25kva at Kulhand, Dhara A, Ludna, repair of HT LT Udhyanpur, Cabling HT Posta also improvement of HT LT at Battal, Hanch and Ludna under PRI ]
[ ED Doda/JPDCL/31 of 2024-25 ][2024_PDD_262106_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
90 |
24-Oct-2024 04:00 PM |
31-Oct-2024 04:00 PM |
02-Nov-2024 12:00 PM |
[Installation of dedicated essential feeder along with Creation of Electric Substation for WSS Regional Parihaspora-RETENDER]
[EDG/V/103 OF 2024-25][2024_PDD_262123_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
91 |
24-Oct-2024 04:00 PM |
15-Nov-2024 04:00 PM |
18-Nov-2024 11:00 AM |
[Creation of 2X250 KVA and 2X100 KVA S/Stn. alongwith HT/LT Line at WSS Qasba Bandichechian under JJM 1. Creation of 250 KVA S/Stn. at Pumping Station Base Borewell No.01 2. Creation of 250 KVA S/Stn. at Pumping Station Bore Well 02 3. Creation of 100]
[e-NIT No.EDP/53 of 2024 dated.24.10.2024][2024_PDD_262124_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Poonch |
92 |
24-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Supply, Fixing, testing and commissioning of street ]
[EDIV- 35 of 2024-25][2024_PDD_262118_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal |
93 |
24-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 02:00 PM |
[Creation 2x25kva at kastigarh B,Mundhar Lower B along with HT LT Also Improvement of HT LT network at Hanga, Noori, Misrata,N Karya, Wanda Beoli, under PRI]
[ ED Doda/JPDCL/32 of 2024-25][2024_PDD_262113_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
94 |
24-Oct-2024 04:00 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 01:00 PM |
[Creation of 25 KVA Feasible Substation at PHC Kachan]
[EDG/V/101 OF 2024-25][2024_PDD_262076_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
95 |
24-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
07-Nov-2024 05:00 PM |
[Creation of Electric Sub Station in Tribal Areas 2024-25]
[EDbpr 30of 2024-25][2024_PDD_262067_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
96 |
24-Oct-2024 04:00 PM |
12-Nov-2024 02:00 PM |
13-Nov-2024 02:00 PM |
[Upgrd.of eletric service line crossing river Jehlum behind DC office Baramulla under Untied Grants 2024-25]
[EDB/91][2024_PDD_262036_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
97 |
24-Oct-2024 03:30 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 02:00 PM |
[Creation of 4x25 KVA at Dhara-B, Kulhand, Repair of HT LT at Bharat-B and Bagla, Improvement of HT LT at Sharote under PRI]
[ ED Doda/JPDCL/30 of 2024-25][2024_PDD_262095_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
98 |
24-Oct-2024 03:30 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 02:00 PM |
[R and M of Distribution Sub stations for ED Handwara]
[e-NIT 11 of 2024-25][2024_PDD_262062_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
99 |
24-Oct-2024 03:00 PM |
14-Nov-2024 04:00 PM |
15-Nov-2024 12:00 PM |
[Renovation and Modernization of Distribution Sub-stations for ED Kupwara under UT Capex Budget 2024-25]
[e-NIT 16 of 2024-25][2024_PDD_262059_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
100 |
24-Oct-2024 03:00 PM |
14-Nov-2024 04:00 PM |
15-Nov-2024 12:00 PM |
[Creation and Augmentation of Feasible Sub-Stations under Jurisdiction of Electric Division Kupwara under UT Capex Budget 2024-25]
[e-NIT 15 of 2024-25][2024_PDD_262058_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
101 |
24-Oct-2024 03:00 PM |
14-Nov-2024 04:00 PM |
15-Nov-2024 12:00 PM |
[Improvement of HT LT Network under Jurisdiction of ED Kupwara under UT Capex Budget 2024-25.]
[e-NIT 14 of 2024-25][2024_PDD_262053_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
102 |
24-Oct-2024 03:00 PM |
05-Nov-2024 11:00 AM |
05-Nov-2024 02:00 PM |
[CREATION / AUGMENTATION / IMPROVEMENT OF HT/LT NETWORK UNDER UT CAPEX BUDGET 2024-25 UNDER THE JURISDICTION OF KPDCL DIVISION SHOPIAN]
[EDS/E-TENDER/26 OF 2024-25 DATED 24-10-2024][2024_PDD_262074_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
103 |
24-Oct-2024 03:00 PM |
14-Nov-2024 04:00 PM |
15-Nov-2024 12:00 PM |
[Replacement of wornout conductor and rotten poles under Jurisdiction of Electric Division Kupwara under UT Capex Budget 2024-25]
[e-NIT 17 of 2024-25][2024_PDD_262068_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
104 |
24-Oct-2024 03:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 02:00 PM |
[Improvement of HT LT Network for ED Handwara]
[e-NIT 12 of 2024-25][2024_PDD_262094_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
105 |
24-Oct-2024 03:00 PM |
07-Nov-2024 02:00 PM |
08-Nov-2024 01:00 PM |
[CREATION OF 1X25 KVA SUBSTATION ALONG WITH HT/LT NETWORK AT KGN MASJID AGRATI IN SUBDIVISION RAJOURI-I UNDER SSY SCHEME.]
[EDR/37 of 2024-25 Dated 24.10.2024][2024_PDD_262082_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Rajouri |
106 |
24-Oct-2024 02:00 PM |
13-Nov-2024 02:00 PM |
14-Nov-2024 03:00 PM |
[Supply, Installation, Testing and Commissioning of Spares for 33/11 KV Receiving Stations to meet Eventuality during Peak winters under Capex 2024-25]
[STDS/12 of 2024-25][2024_PDD_262064_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||STD-Sopore |
107 |
24-Oct-2024 01:00 PM |
02-Nov-2024 02:00 PM |
04-Nov-2024 02:00 PM |
[Supply Installation Testing and Commissioning of 250kVA 33/0.433kV Auxiliary Copper Wound Transformer and associated works at Bemina GSS for providing uninterrupted power supply to MD JKPTCL office at PDD Comlex Bemina]
[11/JKPTCL/TLMD-I/SGR/2024-25 Dated 24.10.2024][2024_PDD_262040_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-I Srinagar |
108 |
24-Oct-2024 10:00 AM |
13-Nov-2024 04:00 PM |
14-Nov-2024 03:00 PM |
[Fixing of Rate contract for repair of Distribution Transformers of various capacities at various sites in District Udhampur under Electric Division, JPDCL Udhampur for the year 2024-25 or till next year tender finalised ]
[ED/UDH/25 of 2024-25 dated 23-10-2024][2024_PDD_261974_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
109 |
24-Oct-2024 09:00 AM |
13-Nov-2024 02:00 PM |
14-Nov-2024 03:00 PM |
[Renovation and Modernization of various Receiving Stations of District Baramulla and Kupwara pertaining to STD Sopore under Capex 2024-25]
[STDS/11 of 2024-25][2024_PDD_261997_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||STD-Sopore |
110 |
24-Oct-2024 09:00 AM |
13-Nov-2024 02:00 PM |
14-Nov-2024 03:00 PM |
[Supply, Installation, Testing and Commissioning of 11 KV Isolator, Double Break,3-pole, 630 Amp, Horizontal mounting Type, with Earth Switch for various Receiving Stations of STD Sopore under UT Capex 24-25]
[STDS/10 of 2024-25][2024_PDD_261993_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||STD-Sopore |
111 |
23-Oct-2024 06:00 PM |
14-Nov-2024 02:00 PM |
16-Nov-2024 01:00 PM |
[Provision for Transformers to be kept at BHQ on Buffer mode at PH Kulhama Block Chandil Wanigam (Under DISTRICT CAPEX BUDGERT -2024-25) ( PRI Grants)]
[E-NIT No.SSDT/26 of 2024-25,Dated 23/10/2024][2024_PDD_261917_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
112 |
23-Oct-2024 05:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 02:30 PM |
[Renovation and Modernisation of Control Room Building of Recieving station Khiram]
[STB/21 of 2024-25 Dated 23.10.2024][2024_PDD_261969_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
113 |
23-Oct-2024 05:00 PM |
04-Nov-2024 11:00 AM |
04-Nov-2024 02:00 PM |
[Stage contract for Carrying out various SITC, ITC works as per the SBD and BOQ under the Jurisdiction of KPDCL Sub Division Shopian, Keller and Chitragam 2024-25]
[EDS/E-TENDER/24 OF 2024-25 DATED 23-10-2024][2024_PDD_261904_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
114 |
23-Oct-2024 05:00 PM |
04-Nov-2024 12:00 PM |
04-Nov-2024 05:00 PM |
[Annual Rate Contract for hiring of vehicle, for Ferrying of transformers, other Key material required in Division for the year 2024-25 within the jurisdiction of KPDCL Division SHopian]
[EDS/E-TENDER/25 OF 2024-25 DATED 23-10-2024][2024_PDD_261931_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
115 |
23-Oct-2024 04:30 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Replacement of Wornout Conductor and rotten poles for ED Handwara]
[e-NIT 09 of 2024][2024_PDD_261952_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
116 |
23-Oct-2024 04:30 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Replacement of Bare Conductor by LT AB cable for ED Handwara]
[e-NIT 10 of 2024-25][2024_PDD_261967_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
117 |
23-Oct-2024 04:10 PM |
04-Nov-2024 11:00 AM |
04-Nov-2024 02:00 PM |
[Improvement of power infrastructure under DDC and PRI Grants 2024-25 in KPDCL Awantipora ]
[EDA-22of24-25 DT-23-10-24][2024_PDD_261958_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
118 |
23-Oct-2024 04:00 PM |
08-Nov-2024 04:00 PM |
09-Nov-2024 01:00 PM |
[Shifting of 63 KVA Substation at Bhat Mohalla Watalbagh]
[EDG/V/097 OF 2024-25][2024_PDD_261872_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
119 |
23-Oct-2024 04:00 PM |
08-Nov-2024 04:00 PM |
09-Nov-2024 01:00 PM |
[Stabilization of HT/LT network at Dard Wooder Kangan]
[EDG/V/098 OF 2024-25][2024_PDD_261912_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
120 |
23-Oct-2024 04:00 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Providing of Power Supply to FPN Kultoora and Guloora .]
[e-NIT 08 of 2024][2024_PDD_261930_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
121 |
23-Oct-2024 04:00 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 01:00 PM |
[Augmentation of Critically overloaded DTs for Winter preparedness of ED Ganderbal]
[EDG/V/099 OF 2024-25][2024_PDD_261944_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
122 |
23-Oct-2024 04:00 PM |
12-Nov-2024 03:00 PM |
13-Nov-2024 03:00 PM |
[Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Installation of 63 KVA transformer at Village Upper Farole Near Masjid Sharief Pyt. Blandh Block Parlidhar, District Udhampur under DDC Grants on turnkey basis. ]
[ED/UDH/24 of 2024-25 dt. 23-10-2024][2024_PDD_261951_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
123 |
23-Oct-2024 04:00 PM |
08-Nov-2024 04:00 PM |
09-Nov-2024 01:00 PM |
[Improvement of LT network at 250 KVA main Kachan from Main Road to H/o Mushtaq Ah Wani, Fayaz Ah Sheikh, Mehraj u din Wani and others]
[EDG/V/096 OF 2024-25][2024_PDD_261840_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
124 |
23-Oct-2024 04:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 11:00 AM |
[CREATION/AUGMENTATION OF ELECTRICAL INFRASTRUCTURE UNDER DDC GRANTS IN ED ANANTNAG-4 WORKS]
[72/EDA OF 2024-25][2024_PDD_261901_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
125 |
23-Oct-2024 04:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS WITH HT/LT NETWORK UNDER DDC GRANTS FALLING THE JURIDICTION OF ED ANANTNAG]
[71/EDA OF 2024-25][2024_PDD_261856_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
126 |
23-Oct-2024 04:00 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 04:00 PM |
[Replacement of damaged 132 Kv Isolators on 132 Kv ICT Circuit-I bay at 200 MVA, 132/33 KV Grid Station Pampore]
[TLMD-II/12 of 2024-25][2024_PDD_261906_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-II Pampore |
127 |
23-Oct-2024 03:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 12:00 PM |
[Creation of 63 KVA Sub-Station alongwith HT/LT network at Mir Mohalla Ganie Mohalla Wavoora Lolab Kupwara under UT Capex Budget 2024-25]
[e-NIT 12 of 2024-25][2024_PDD_261913_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
128 |
23-Oct-2024 03:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 12:00 PM |
[Creation of 63KVA Sub-Station with HT/LT network at Naghbal Chandigam Kupwara under UT Capex Budget 2024-25]
[e-NIT 09 of 2024-25][2024_PDD_261896_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
129 |
23-Oct-2024 03:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 12:00 PM |
[Creation of 100 KVA Sub-Station alongwith HT/LT network at upper Gheerhati Lolab Byepas Kupwara under UT Capex Budget 2024-25]
[e-NIT 10 of 2024-25][2024_PDD_261903_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
130 |
23-Oct-2024 03:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 12:00 PM |
[Creation of 100 KVA Sub-Station alongwith HT/LT network at Mir Mohalla, Sofi Mohalla Marhama Kupwara under UT Capex Budget 2024-25]
[e-NIT No. 11 of 2024-25][2024_PDD_261910_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
131 |
23-Oct-2024 03:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 12:00 PM |
[Creation of 63 kva Sub-station along with HT LT Network at Moominabad A Drugmullah Kupwara under UT Capex Budget 2024-25]
[e-NIT 13 of 2024-25][2024_PDD_261923_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
132 |
23-Oct-2024 03:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 12:00 PM |
[Creation of 63KVA Sub-Station with HT/LT network at Bhat Mohalla Bumhama Kupwara under UT Capex Budget 2024-25]
[e-NIT No. 06 of 2024-25][2024_PDD_261878_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
133 |
23-Oct-2024 03:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 12:00 PM |
[Creation of 100KVA Sub-Station with HT/LT network at Pazipora Check Ward 01 Kupwara under UT Capex Budget 2024-25]
[e-NIT 07 of 2024-25][2024_PDD_261884_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
134 |
23-Oct-2024 03:00 PM |
13-Nov-2024 04:00 PM |
14-Nov-2024 12:00 PM |
[Creation of 100 KVA Sub-Station along with HT/LT network at Main Market Sogam Kupwara under UT Capex Budget 2024-25]
[e-NIT No 08 of 2024-25][2024_PDD_261890_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
135 |
23-Oct-2024 01:15 PM |
08-Nov-2024 04:35 PM |
09-Nov-2024 10:30 AM |
[Charging of Un-Commissioned 25/63/100 KVA HVDS Sub-Stations (EMC Infrastructure) created under RAPDRP Scheme by way of executing Balance Works - (ESD Rajbagh) - (under Capex Budget 2024-25 / Scheme Code PDDSS2324100142)]
[ED-II/17 of 2024-25 Dated 22/10/24 (Balance EMC works)][2024_PDD_261866_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
136 |
23-Oct-2024 09:00 AM |
13-Nov-2024 04:00 PM |
14-Nov-2024 02:00 PM |
[Augmentation of 66/11 KV Receiving station ]
[e-NIT/2024-25/06 Dated 22.10.2024][2024_PDD_261812_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||STD-III Kathua |
137 |
22-Oct-2024 06:00 PM |
13-Nov-2024 01:00 PM |
14-Nov-2024 01:00 PM |
[Installation of LT Poles at Archanderhama]
[E-NIT No.SSDT/25 of 2024-25,Dated 22/10/2024][2024_PDD_261756_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
138 |
22-Oct-2024 06:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[reation of 100 KVA sub -station ]
[NIT-34 of 2024-25][2024_PDD_261781_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal |
139 |
22-Oct-2024 06:00 PM |
06-Nov-2024 04:30 PM |
07-Nov-2024 04:30 PM |
[Rate Contract for Augmentation of Distribution Transformers]
[enit30of 2024-35 Dated22-10-2024][2024_PDD_261796_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Reasi |
140 |
22-Oct-2024 05:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 02:00 PM |
[Creation of 2x25kva at Kotwal Mohalla Doki, Kumar Mohalla Gosti, Augmentation 25 to 63kva at Jagota and Shifting of HT line at Nai Bhalara under PRI ]
[ ED Doda/JPDCL/28 of 2024-25][2024_PDD_261779_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
141 |
22-Oct-2024 05:00 PM |
06-Nov-2024 04:00 PM |
07-Nov-2024 02:30 PM |
[Renovation and modernisation of control room building of 33/11 kV 6.3 MVA Recieving station Zirpara]
[STB/20 of 2024-25 Dt. 22.10.2024][2024_PDD_261744_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
142 |
22-Oct-2024 05:00 PM |
13-Nov-2024 02:30 PM |
14-Nov-2024 02:30 PM |
[Construction of additional bay at Receiving Station Wanganpora (Civil Works)]
[eNIT No STD-II / 27 of 2024-25 Dated 22-10-2024][2024_PDD_261745_1]
|
DC-PDD||CE-M and RE Wing Kashmir||CIRCLE II-Srinagar |
143 |
22-Oct-2024 05:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 02:00 PM |
[Creation of 100KVA at Kawani Panshai, Creation of 25 KVA at Plaran Rokali, HT LT Poles at Sunarthawa, HT poles in Line from Thelala to Jhandani under PRI ]
[ ED Doda/JPDCL/29 of 2024-25][2024_PDD_261785_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
144 |
22-Oct-2024 04:00 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 04:00 PM |
[Development of Control Room building and replacing of damaged corrugated G.S Sheets of roofing of main control room building at 200 MVA, 132/33 KV Grid Station Pampore]
[TLMD-II/10 of 2024-25][2024_PDD_261731_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-II Pampore |
145 |
22-Oct-2024 04:00 PM |
11-Nov-2024 02:00 PM |
12-Nov-2024 02:00 PM |
[Augmentation of (6 No 63kVA Transformer by 100kVA transformer at Hamdub Panzalla,Rawaththpora Lachipora ,Bagi Rehmat Bowli Kanlibagh, ,Sangri, Mulsuma Sheeri, Kalantra Bala), (1 no 50kVA by 100kVA at Barman Shutloo) and (01nos 25kVA Transformer ]
[EDB/90][2024_PDD_261677_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
146 |
22-Oct-2024 04:00 PM |
11-Nov-2024 02:00 PM |
12-Nov-2024 02:00 PM |
[Creation of 100kVA transformer at Sofi Mohalla Shirpora under PRI Grants 2024-25]
[EDB/89][2024_PDD_261673_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
147 |
22-Oct-2024 04:00 PM |
12-Nov-2024 03:00 PM |
13-Nov-2024 03:00 PM |
[Survey Supply Transportation Carriage Erection, Testing and Commissioning for Creation of 63 KVA S.S alongwith HT.LT for providing of three phase connection for Bailing and Shredder Machines in the Plastic Waste Management Shed at Block Chaunta]
[ED/UDH/23 OF 2024-25 DATED 22-10-2024][2024_PDD_261734_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
148 |
22-Oct-2024 04:00 PM |
12-Nov-2024 03:00 PM |
13-Nov-2024 03:00 PM |
[Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Electrification of left out un-electrified households in Block Basantgarh under ABDP on turnkey basis ]
[ED/UDH/22 of 2024-25 dt. 22-10-2024][2024_PDD_261705_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
149 |
22-Oct-2024 04:00 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 04:00 PM |
[Replacement of cable trench covers, repair of damaged cable trenches and concreting of 132 KV Awantipora-II bay at 200 MVA, 132/33 KV Grid Station Pampore]
[TLMD-II/09 of 2024-25][2024_PDD_261712_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-II Pampore |
150 |
22-Oct-2024 04:00 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 04:00 PM |
[Carrying out concreting of 08 No. 132 Kv Line bays at 175 MVA, 132/33 KV Grid Station Awantipora]
[TLMD-II/11 of 2024-25][2024_PDD_261748_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-II Pampore |
151 |
22-Oct-2024 04:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 11:00 AM |
[CREATION/HTLT NETWORK/SHIFTING OF SUB STATIONS-6 WORKS UNDER DDC GRANTS]
[70/EDA OF 2024-25][2024_PDD_261767_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
152 |
22-Oct-2024 04:00 PM |
11-Nov-2024 02:00 PM |
12-Nov-2024 02:00 PM |
[Shifting of LT/ HT lines near under contruction DDC Building at Jetty Under DDC 2024-25]
[EDB/88][2024_PDD_261668_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
153 |
22-Oct-2024 04:00 PM |
11-Nov-2024 02:00 PM |
12-Nov-2024 02:00 PM |
[Shifting of transformer at W No 03 Zahanpora from L/O Ab Aziz Lone Under DDC 2024-25]
[EDB/87][2024_PDD_261662_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
154 |
22-Oct-2024 04:00 PM |
11-Nov-2024 02:00 PM |
12-Nov-2024 02:00 PM |
[Shifting of HT line near L/O Nazir Khan and others at Pringal under PRI 2024-25]
[EDB/86][2024_PDD_261659_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
155 |
22-Oct-2024 04:00 PM |
08-Nov-2024 04:00 PM |
09-Nov-2024 01:00 PM |
[Installation of HT LT Poles with Hot Line from Receiving station Batwina Darul uloom to Bhagwanpora water scheme and Hospital at Batwina B.]
[EDG/V/095 OF 2024-25][2024_PDD_261650_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
156 |
22-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
04-Nov-2024 05:00 PM |
[Procurement of LT Poles for DDC constituency Hajin B]
[EDBpr 25 of 2024-25][2024_PDD_261493_2]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
157 |
22-Oct-2024 04:00 PM |
14-Nov-2024 04:00 PM |
16-Nov-2024 02:00 PM |
[Improvemet of LT/HT network with transformer at Kanhar Colony AND Bhat Mohalla Botingoo A Under PRI Grants 2024-25]
[EMDS/102][2024_PDD_258590_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
158 |
22-Oct-2024 03:50 PM |
04-Nov-2024 11:00 AM |
04-Nov-2024 02:00 PM |
[Installation of 63 KVA Sub-station at indoor sports hall tral Pulwama]
[EDA-21of2024-25Dt-22-10-2024][2024_PDD_261749_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
159 |
22-Oct-2024 03:40 PM |
04-Nov-2024 11:00 AM |
04-Nov-2024 02:00 PM |
[CREATION / AUGMENTATION OF VARIOUS SUB STATION AT VARIOUS LOCATIONS UNDER THE JURISDICTION OF SUB STATION CHITRAGAM AND KELLER KPDCL DIVISION SHOPIAN UNDER PRI AND ABDP GRANTS 2024-25]
[EDS/E-TENDER/23 OF 2024-25 DATED 22-10-2024][2024_PDD_261738_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
160 |
22-Oct-2024 03:00 PM |
12-Nov-2024 04:00 PM |
13-Nov-2024 12:00 PM |
[Providing of Electric Power Supply enabling 4G Mobile Saturation in un-covered village and USO sites under UT capex Budget.]
[e-NIT No. 05 of 2024-25][2024_PDD_261681_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||ED Kupwara |
161 |
22-Oct-2024 03:00 PM |
02-Nov-2024 11:00 AM |
02-Nov-2024 02:00 PM |
[CREATION OF 63KVA SUB STATION ALONG WITH HT/LT NETWORK AT PALLA MOHALLA KAPRIN PYT HALQA KAPRIN]
[EDS/E-TENDER/22 OF 2024 DATED 22-10-2024][2024_PDD_261664_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
162 |
22-Oct-2024 03:00 PM |
05-Nov-2024 02:00 PM |
05-Nov-2024 03:00 PM |
[PDDSS2022100402-Replacement of Bare Conductor by LT AB Cable for ED]
[EDBpr 28 of 2024-25][2024_PDD_261728_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
163 |
22-Oct-2024 03:00 PM |
04-Nov-2024 11:00 AM |
04-Nov-2024 02:00 PM |
[Providing of power supply to various health Sub-Centres in KPDCL Division Awantipora UNDER DISTRICT CAPEX]
[EDA-20of2024-25Dated22-10-2024][2024_PDD_261732_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
164 |
22-Oct-2024 02:15 PM |
05-Nov-2024 02:00 PM |
05-Nov-2024 03:00 PM |
[PDDSS2022100422-R and M of Distribution Sub-Station for ED Bandipora under UT]
[EDBpr 27 OF 2024-25][2024_PDD_261700_3]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
165 |
22-Oct-2024 02:00 PM |
05-Nov-2024 02:00 PM |
05-Nov-2024 03:00 PM |
[Installation of Transformer at ITI Bandipora]
[EDBpr 26 of 2024 25][2024_PDD_261676_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
166 |
22-Oct-2024 10:00 AM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[ Providing of Essential power supply ]
[ 33/EDIV of 2023-24][2024_PDD_261584_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal |
167 |
21-Oct-2024 06:00 PM |
12-Nov-2024 04:00 PM |
14-Nov-2024 02:30 PM |
[AUGMENTATION OF GSS MAGAM FROM 50 TO 100 MVA EXECUTION OF BALANCE CIVIL WORKS THEREOF]
[EE/TLMDA/04 OF 2024][2024_PDD_261546_1]
|
DC-PDD||CE-S and O Wing Kashmir |
168 |
21-Oct-2024 06:00 PM |
11-Nov-2024 02:00 PM |
12-Nov-2024 02:00 PM |
[Supply of 11 kV VCB Panel in respect of STD Ganderbal]
[e_NIT no 13 of 2024-25 dated 21-10-2024][2024_PDD_261543_2]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||STD-Ganderbal |
169 |
21-Oct-2024 05:15 PM |
12-Nov-2024 04:00 PM |
14-Nov-2024 02:00 PM |
[Replacement of Bare Conductor by LT-AB Cable Part 2 (at 100kva Usman abad Warpora near Masjid Rahamat and 63kva new Sub Station near H/O Tariq Ah (of 11KV Warpora Feeder) At ESD 3rd of ED Sopore) under UT Capex 2024-25]
[EMDS/169][2024_PDD_261218_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
170 |
21-Oct-2024 05:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 11:00 AM |
[Installation of 2 No Transfarmers 25 KV at ward no 1 and 2 and 63 KV transformer Kharmohlla Gujer Basti Ward No 4,5and6]
[69/EDA OF 2024-25][2024_PDD_261587_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
171 |
21-Oct-2024 05:00 PM |
12-Nov-2024 04:00 PM |
14-Nov-2024 02:00 PM |
[Replacement of Bare Conductor by LT-AB Cable Part 1 ( At Naseem Bagh of Town II 11KV ESD 2nd of ED Sopore) under UT Capex 2024-25]
[EMDS/168][2024_PDD_261211_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
172 |
21-Oct-2024 05:00 PM |
06-Nov-2024 04:00 PM |
07-Nov-2024 02:00 PM |
[Installation of Street lights at various Places in Srinagar.]
[E NIT NO 046 OF ED-I][2024_PDD_261580_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
173 |
21-Oct-2024 05:00 PM |
12-Nov-2024 02:00 PM |
13-Nov-2024 04:00 PM |
[Supply, Installation, Testing Commissioning of OSR (Oil Surge Relay) for Power Transformer 450 MVA, 220/132KV Grid station Pampore and Zainakote ]
[TLMD-IV/e-NIT/03 0F 2024-25][2024_PDD_261586_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-IV Pampore |
174 |
21-Oct-2024 05:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 11:00 AM |
[CREATION/UPGRADATION OF ELECTRICAL INFRASTRUCTURE UNDER PRI GRANTS IN ED ANANTNAG-2 WORKS]
[68/EDA OF 2024-25][2024_PDD_261576_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
175 |
21-Oct-2024 05:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 01:00 PM |
[CREATION OF VARIOUS SUBSTATIONS ALONG WITH HT/LT NETWORK FOR VARIOUS WSS IN SUBDIVISION SUNDERBANI UNDER JJM]
[EDR/36 of 2024-25 Dated 21.10.2024][2024_PDD_261589_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Rajouri |
176 |
21-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Lt Improvement at PH Samnoo under APDP Grants 2024-25]
[EDK/e-tender/21(01) of 2024-25][2024_PDD_261524_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
177 |
21-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Installation of Highmast lights at Panchayat Halqa Check Badwani, PH Rampora and repairment of Existing High Mast light sat Halqa Check Badwani under APDP Grants 2024-25.]
[EDK/e-tender/21(02) of 2024-25][2024_PDD_261531_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
178 |
21-Oct-2024 04:55 PM |
14-Nov-2024 04:00 PM |
16-Nov-2024 02:00 PM |
[AMC 2024-25 Transmission lines]
[TLMD-7/ 05 of 2024-25][2024_PDD_261309_1]
|
DC-PDD||CE-S and O Wing Kashmir |
179 |
21-Oct-2024 04:30 PM |
14-Nov-2024 04:00 PM |
16-Nov-2024 02:00 PM |
[AMC Grid Substations 2024-25]
[TLMD-7/ 04 of 2024-25][2024_PDD_261284_1]
|
DC-PDD||CE-S and O Wing Kashmir |
180 |
21-Oct-2024 04:30 PM |
11-Nov-2024 04:00 PM |
12-Nov-2024 01:00 PM |
[Installation of LT Network at various 4G BSNL sites Viz Behnipora, Kenyl, Satkoji, Tarathpora, Bakihaker, Waripora, Sirajpora, Unisoo, Mandigam, Khanoo, Darbal pain, Moona bal, Tulwari, Nihama, Pandit pora, Rawalpora, Sahipora under UT Capex 2024-25]
[e-NIT 07 of 2024-25][2024_PDD_261575_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
181 |
21-Oct-2024 04:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS ALONG WITH HT/LT NETWORK -2 WORKS IN ED ANANTNAG UNDER PRI GRANTS]
[67/EDA OF 2024-25][2024_PDD_261563_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
182 |
21-Oct-2024 04:00 PM |
12-Nov-2024 04:00 PM |
14-Nov-2024 02:00 PM |
[Providing of street lights for specific places at DDC constituency Rohama (PDD Div Sopore) Under DDC Grants 2024-25]
[EMDS/130][2024_PDD_258624_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
183 |
21-Oct-2024 04:00 PM |
08-Nov-2024 04:00 PM |
09-Nov-2024 01:00 PM |
[Creation of 63 KVA Transformer at Darakpora Batsar road halqa Korag]
[EDG/V/094 OF 2024-25][2024_PDD_261567_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
184 |
21-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
04-Nov-2024 05:00 PM |
[Procurement of LT Poles along with Conductor at Qazipora, Watapora, Patushai,]
[EDBpr 23 of 2024-25][2024_PDD_261476_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
185 |
21-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
04-Nov-2024 05:00 PM |
[Installation of Transformer for Lift Irrigation at Ashtangoo]
[EDBpr 22 of 2024-25][2024_PDD_261464_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
186 |
21-Oct-2024 04:00 PM |
12-Nov-2024 04:00 PM |
14-Nov-2024 02:00 PM |
[Creation of 63 KVA Sub Station at Usmanabad Warapora near H/O Tariq Ahmad Bhat . Under DDC Grants 2024-25]
[EMDS/143][2024_PDD_261547_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
187 |
21-Oct-2024 04:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS ALONG WITH HT/LT NETWORK -3 WORKS IN ED ANANTNAG UNDER PRI GRANTS]
[EDA/65 OF 2024-25][2024_PDD_261526_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
188 |
21-Oct-2024 04:00 PM |
08-Nov-2024 04:00 PM |
09-Nov-2024 01:00 PM |
[Installation of transformer and poles at Zanger Mohalla Lone Mohalla at Batwina A]
[EDG/V/092 OF 2024-25][2024_PDD_261521_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
189 |
21-Oct-2024 04:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS ALONG WITH HT/LT NETWORK -2 WORKS IN ED ANANTNAG UNDER PRI GRANTS]
[66/EDA OF 2024-25][2024_PDD_261545_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
190 |
21-Oct-2024 04:00 PM |
08-Nov-2024 04:00 PM |
09-Nov-2024 01:00 PM |
[Providing of Electric Lights at DDC Constituency Wakura B.]
[EDG/V/093 OF 2024-25][2024_PDD_261533_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
191 |
21-Oct-2024 04:00 PM |
11-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Const of new 33 KV line for MES Ratnuchak]
[STD-II/2024-25/Ratnuchak/07][2024_PDD_261537_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||STD-II Jammu |
192 |
21-Oct-2024 04:00 PM |
04-Nov-2024 11:00 AM |
04-Nov-2024 02:00 PM |
[Supply Installation Testing and Commissioning of 25 KVA Single Phase Diesel Generator set at the Official Residence of Honble Chief Justice High Court of Jammu Kashmir and Ladakh Retender]
[E NIT NO 045 OF ED-I][2024_PDD_261510_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
193 |
21-Oct-2024 04:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 11:00 AM |
[CREATION/UPGRADATION OF ELECTRICAL INFRASTRUCTURE UNDER PRI GRANTS IN ED ANANTNAG-3 WORKS under PRI Grants in ED Anantnag]
[EDA/64 OF 2024-25][2024_PDD_261492_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
194 |
21-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
04-Nov-2024 05:00 PM |
[Upgradation of Transformers at Halvari Near Middle School Argam]
[EDBpr 24 of 2024-25][2024_PDD_261485_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
195 |
21-Oct-2024 02:00 PM |
12-Nov-2024 04:00 PM |
14-Nov-2024 02:00 PM |
[Installation of 100 Kva Transformer with LT and HT Network near shop of Gh Mohd Malla and Abdul Rahman at Shalboni (Block Sherabad khore, PH Budibugh) Under PRI Grants 2024-25]
[EMDS/139][2024_PDD_261497_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
196 |
21-Oct-2024 11:00 AM |
04-Nov-2024 02:00 PM |
05-Nov-2024 01:00 PM |
[CREATION OF VARIOUS SUBSTATIONS ALONG WITH HT/LT NETWORK AND LAYING OF LT NETWORK IN SUBDIVISION KOTRANKA UNDER UT CAPEX.]
[EDR/34 of 2024-25 Dated 21.10.2024][2024_PDD_261454_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Rajouri |
197 |
21-Oct-2024 11:00 AM |
04-Nov-2024 02:00 PM |
05-Nov-2024 01:00 PM |
[CREATION OF VARIOUS SUBSTATIONS ALONG WITH HT/LT NETWORK FOR VARIOUS WSS IN SUBDIVISION SUNDERBANI UNDER JJM..]
[EDR/35 of 2024-25 Dated 21.10.2024][2024_PDD_261455_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Rajouri |
198 |
21-Oct-2024 10:00 AM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Rate contract for providing of Manpower labour charge for rebuilding of damaged transformers in FY 2024]
[EDIV/30][2024_PDD_261418_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal |
199 |
21-Oct-2024 09:00 AM |
04-Nov-2024 09:00 AM |
04-Nov-2024 10:00 AM |
[Creation of 63kVA transformer at new Colony Barzulla Panzigam]
[EDBpr 21 of 2024-25][2024_PDD_261416_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
200 |
21-Oct-2024 09:00 AM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Rate contract for providing of Manpower labour charges for loading unloading and carriage of various materials equipment at divisional stores Khanyar and other sites of EDIV Khanyar]
[EDIV/31][2024_PDD_261439_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal |
201 |
21-Oct-2024 09:00 AM |
31-Oct-2024 09:00 AM |
01-Nov-2024 09:00 AM |
[Provisioning of Electrical Connections at sites proposed under 4G Saturation]
[EDBpr 17 of 2024-25][2024_PDD_261398_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
202 |
21-Oct-2024 09:00 AM |
30-Oct-2024 04:00 PM |
31-Oct-2024 02:00 PM |
[Improvement of LT network at 100 KVA Sheikh Mohalla Dagpora Phase I AND II) within the jurisdiction of ED IV Khanyar under HTLT improvement capex 202425 PDDSS20221000283 ]
[EDIV/32][2024_PDD_261441_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal |
203 |
21-Oct-2024 09:00 AM |
01-Nov-2024 09:00 AM |
01-Nov-2024 10:00 AM |
[PDDSS2022100311- Creation/Augmentations of feasible Substations for ED]
[EDBpr 18 of 2024-25][2024_PDD_261428_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
204 |
21-Oct-2024 09:00 AM |
04-Nov-2024 09:00 AM |
04-Nov-2024 10:00 AM |
[PDDSS2425100081 Replacement of Worn out conductor and rotten poles in Ed]
[EDBpr 19 of 2024-25 ][2024_PDD_261425_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
205 |
21-Oct-2024 09:00 AM |
04-Nov-2024 09:00 AM |
04-Nov-2024 10:00 AM |
[ Improvement of HT and LT network for ED Bandipora]
[EDBpr 20 of 2024-25][2024_PDD_261422_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
206 |
19-Oct-2024 06:00 PM |
11-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Installation of 100 KVA Transformer (Buffer Stock) (block pattan Ph. Gohal Tengpora) Under PRI Grants 2024-25]
[EMDS/116][2024_PDD_258610_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
207 |
19-Oct-2024 06:00 PM |
11-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Buffer Stock of Transfarmers at Block level under BDC 2024-25 Under BDC Grants 2024-25]
[EMDS/154][2024_PDD_258669_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
208 |
19-Oct-2024 06:00 PM |
11-Nov-2024 02:00 PM |
12-Nov-2024 01:00 PM |
[Installation of 63 Kva Sub Station at Ward No. 03 Hardu Ichloo (Under DISTRICT CAPEX BUDGERT -2024-25) (BDC GRANTS)]
[E-NIT No.SSDT/22 of 2024-25,Dated 19/10/2024][2024_PDD_261237_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
209 |
19-Oct-2024 06:00 PM |
11-Nov-2024 02:00 PM |
12-Nov-2024 01:00 PM |
[Installation of 100 Kva Transformer ( Buffer Stock) at Sariwarpora B (Under DISTRICT CAPEX BUDGERT -2024-25) ( PRI Grants)]
[E-NIT No.SSDT/24 of 2024-25,Dated 19/10/2024][2024_PDD_261280_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
210 |
19-Oct-2024 06:00 PM |
11-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Installation of 63KVA Transformer (Buffer Stock) (Block pattan Sultanpora D) Under PRI Grants 2024-25]
[EMDS/118][2024_PDD_258612_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
211 |
19-Oct-2024 06:00 PM |
11-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Electrification of Panchayat Ghar Duroo A Under PRI Grants 2024-25]
[EMDS/106][2024_PDD_258596_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
212 |
19-Oct-2024 06:00 PM |
11-Nov-2024 02:00 PM |
12-Nov-2024 01:00 PM |
[Upgradation of Transformer for 100 Kva to Level-2 at Nangerpora (Under UT CAPEX BUDGET 2024-25) ( DDC Grants)]
[E-NIT No.SSDT/23 of 2024-25,Dated 19/10/2024][2024_PDD_261250_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
213 |
19-Oct-2024 06:00 PM |
11-Nov-2024 03:00 PM |
12-Nov-2024 02:00 PM |
[Creation of 400 KVA Distribution Sub Station along with HT LT Network at Talab Tillo Jammu Under JnK Agro Industries Development Corp Ltd under Deposit Contribution scheme falling under the jurisdiction of Electric Sub Division Canal on Turnkey]
[ ED-III/Jammu/46 of 2024-25 ][2024_PDD_261322_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-III Jammu |
214 |
19-Oct-2024 05:20 PM |
01-Nov-2024 03:00 PM |
02-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS ALONG WITH HT/LT NETWORK -3 WORKS IN ED ANANTNAG UNDER PRI GRANTS]
[63/EDA OF 2024-25][2024_PDD_261348_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
215 |
19-Oct-2024 05:00 PM |
11-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Buffer Stock of Transfarmers at Block level (Block Sopore Panchayat Sopore) under BDC 2024-25 Under BDC Grants 2024-25]
[EMDS/151][2024_PDD_258663_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
216 |
19-Oct-2024 05:00 PM |
07-Nov-2024 01:00 PM |
08-Nov-2024 01:00 PM |
[Shifting of Transformer alongwith HT LT Network at Srichen]
[EDB/e-tender/ 66 of 2024-25][2024_PDD_261216_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
217 |
19-Oct-2024 05:00 PM |
07-Nov-2024 01:00 PM |
08-Nov-2024 01:00 PM |
[Improvement of LT network at Adlash Magam]
[EDB/e-tender/ 66 of 2024-25][2024_PDD_261204_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
218 |
19-Oct-2024 05:00 PM |
11-Nov-2024 02:30 PM |
13-Nov-2024 02:30 PM |
[Supply of material required from time to time for day to day operation / Maintenance of 33KV lines and 33/11 KV Receiving station of Sub Transmission Division-II, Rajbagh during the financial year 2024-25 or till next rate contract (Left over items).]
[eNIT No. STD-II / 26 of 2024-25 Dated 18-10-2024][2024_PDD_261207_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
219 |
19-Oct-2024 05:00 PM |
11-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Buffer Stock of Transfarmers at Block level ( Block Tujar Sharif) under BDC 2024-25 Under BDC Grants 2024-25]
[EMDS/152][2024_PDD_258666_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
220 |
19-Oct-2024 05:00 PM |
07-Nov-2024 01:00 PM |
08-Nov-2024 01:00 PM |
[Renovation and Modernization of 250 Kva Substation at Akad along with Improvement of HT LT Network for ED Bijbehara]
[EDB/e-tender/ 68 of 2024-25 ][2024_PDD_261258_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
221 |
19-Oct-2024 05:00 PM |
07-Nov-2024 01:00 PM |
08-Nov-2024 01:00 PM |
[Creation of 250 Kva Substation at Akad Agerpora near Graveyard for ED Bijbehara]
[EDB/e-tender/ 68 of 2024-25 ][2024_PDD_261249_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
222 |
19-Oct-2024 05:00 PM |
07-Nov-2024 01:00 PM |
08-Nov-2024 01:00 PM |
[Replacement of HT Bare Conductor with Cable from Main Road to Masjid Shareef Graveyard at Dar Pora, Matipora]
[EDB/e-tender/ 67 of 2024-25 ][2024_PDD_261232_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
223 |
19-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Generator for PHC Manzgam under ABDP Grants 2024-25.]
[EDK/e-tender/20 of 2024-25][2024_PDD_261219_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
224 |
19-Oct-2024 05:00 PM |
01-Nov-2024 03:00 PM |
02-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS ALONG WITH HT/LT NETWORK AT VARIOUS LOCATIONS AS PER WORK LIST UNDER PRI FALLING IN THE JURIDICTION OF ED ANANTNAG]
[EDA/62 OF 2024-25][2024_PDD_261342_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
225 |
19-Oct-2024 05:00 PM |
11-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Installation of 63KVA Transformer (Buffer Stock) Under PRI Grants 2024-25]
[EMDS/119][2024_PDD_258613_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
226 |
19-Oct-2024 05:00 PM |
11-Nov-2024 04:00 PM |
13-Nov-2024 02:00 PM |
[Installation of 100KVA Transformer (Buffer Stock) (Block Pattan Panchayat Sultanpora B) Under PRI Grants 2024-25]
[EMDS/117][2024_PDD_258611_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
227 |
19-Oct-2024 05:00 PM |
01-Nov-2024 03:00 PM |
02-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS ALONG WITH HT/LT NETWORK -3 WORKS IN ED ANANTNAG UNDER PRI GRANTS]
[61/EDA OF 2024-25][2024_PDD_261329_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
228 |
19-Oct-2024 05:00 PM |
01-Nov-2024 03:00 PM |
02-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS AT VARIOUS LOCATIONS AS PER WORK LIST UNDER PRI FALLING IN THE JURIDICTION OF ED ANANTNAG]
[60/EDA OF 2024-25][2024_PDD_261311_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
229 |
19-Oct-2024 05:00 PM |
01-Nov-2024 03:00 PM |
02-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS AT VARIOUS LOCATIONS AS PER WORK LIST UNDER PRI FALLING IN THE JURIDICTION OF ED ANANTNAG]
[59/EDA OF 2024-25][2024_PDD_261297_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
230 |
19-Oct-2024 04:40 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 01:00 PM |
[Provision of Power Transformers (Augmentation/ 100 KVA, 200KVA and Conductor 0.03 (Wessel) and Poles for DDC Kangan A-Retender.]
[EDG/V/091 OF 2024-25][2024_PDD_261345_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
231 |
19-Oct-2024 04:10 PM |
05-Nov-2024 04:30 PM |
06-Nov-2024 10:30 AM |
[HT/LT Network Improvement of Feeder No. 3 of Receiving Station Exhibition from Saraf Market, Hari Singh High Street to Amirakadal Bridge under Capex Budget 2024-25 (ESD-Hazuribagh) (Scheme Code PDDSS2022100281)]
[ED-II/16 of 2024-25 Dated 17/10/24][2024_PDD_261325_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
232 |
19-Oct-2024 04:00 PM |
08-Nov-2024 04:00 PM |
09-Nov-2024 03:00 PM |
[Supply Installation and Commissioning of Spherical balls at various Grids Including Transmission lines under the jurisdiction of TLMD IV Pampore]
[TLMD-IV/e-NIT/01 0F 2024-25][2024_PDD_261307_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-IV Pampore |
233 |
19-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 01:00 PM |
[Installation of HT Poles at Azduripati Sumbal]
[EDG/V/090 OF 2024-25][2024_PDD_261306_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
234 |
19-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 01:00 PM |
[Installation of LT Poles at various spots at ward No 3 and 8 at Halqa Theeru]
[EDG/V/089 OF 2024-25][2024_PDD_261285_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
235 |
19-Oct-2024 04:00 PM |
01-Nov-2024 03:00 PM |
02-Nov-2024 11:00 AM |
[CREATIONS OF SUB STATIONS UNDER PRI-3 WORKS IN ED ANANTNAG]
[EDA/58 OF 2024-25][2024_PDD_261265_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
236 |
19-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 01:00 PM |
[Upgradation of transformer at Ziyarat Sharief from 100 KVA to 200 KVA (Level 2) and HT Poles also shifting the current/ existing 100 KVA to Reshi Mohalla and Poles at Chountwaliwar C]
[EDG/V/088 OF 2024-25][2024_PDD_261270_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
237 |
19-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 01:00 PM |
[Installation of LT Poles with wire at Ward No 6 and 7 at Chountwaliwar A]
[EDG/V/086 OF 2024-25][2024_PDD_261234_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
238 |
19-Oct-2024 04:00 PM |
01-Nov-2024 03:00 PM |
02-Nov-2024 11:00 AM |
[CREATIONSOF SUB STATIONS UNDER PRI-3 WORKS IN ED ANANTNAG]
[EDA/57 OF 2024-25][2024_PDD_261245_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
239 |
19-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 01:00 PM |
[Installation of 63 KVA transformer and providing HT/LT poles at Koka Mohalla Chountwaliwar C]
[EDG/V/087 OF 2024-25][2024_PDD_261251_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
240 |
19-Oct-2024 04:00 PM |
09-Nov-2024 02:00 PM |
11-Nov-2024 12:00 PM |
[ KED/86 of 2024-25 Dated 19.10.2024 for Replacement of Conductor Weasel to Rabbit in LT network 3Phase 4Wire at different locations of Hiranagar area (Sub Division Hiranagar) of Electric Division Kathua under UT CAPEX Budget 2024-25 on Turnkey Basis]
[KED/86 of 2024-25 Dated 19.10.2024 ][2024_PDD_261231_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Kathua |
241 |
19-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 01:00 PM |
[Upgradation of transformer from 100 KVA to 2 level at Ward No 2 and 3 at Chountwaliwar A.]
[EDG/V/085 OF 2024-25][2024_PDD_261210_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
242 |
19-Oct-2024 03:00 PM |
31-Oct-2024 02:00 PM |
02-Nov-2024 01:00 PM |
[CREATION OF VARIOUS SUBSTATIONS ALONG WITH HT/LT NETWORK FOR VARIOUS WSS IN SUBDIVISION NOWSHERA UNDER JJM]
[EDR/33 of 2024-25 Dated 19.10.2024][2024_PDD_261281_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Rajouri |
243 |
19-Oct-2024 02:20 PM |
08-Nov-2024 04:30 PM |
09-Nov-2024 02:00 PM |
[Rate Contract for Supply of Electric Material HT LT and T and P Equipment Hardware items etc.for STD Udhampur ]
[14][2024_PDD_260976_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||STD-Udhampur |
244 |
19-Oct-2024 12:30 PM |
05-Nov-2024 04:30 PM |
06-Nov-2024 10:30 AM |
[SITC of Suspended LED Light Fixtures On Existing Ornamental Poles in the Lawns at New Secretariat, Srinagar along with PPR Piping arrangement for Refilling of Fuel to 2 No. 625 kVA DG Sets Under Capex Budget 2024-25 (Scheme Code PDDSS2324100143)]
[ED-II/17 of 2024-25 Dated 17/10/24][2024_PDD_261224_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
245 |
18-Oct-2024 05:30 PM |
31-Oct-2024 03:00 PM |
01-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS AND IMPROVEMENT OF HT NETWORK AT VARIOUS LOCATIONS AS PER WORK LIST UNDER PRI FALLING IN THE JURIDICTION OF ED ANANTNAG]
[55/EDA OF 2024-25][2024_PDD_261142_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
246 |
18-Oct-2024 05:30 PM |
30-Oct-2024 04:00 PM |
31-Oct-2024 02:00 PM |
[Creation of 2x25kva at Sarak, Mangota B, shifting 63kva at Labbar Sarak also Improvement of HT LT at Gagla, Bari, Roat A, Mothi A, Behota Upper, Mangota A and kanthi Bahmater under PRI]
[ ED Doda/JPDCL/27 of 2024-25][2024_PDD_261138_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
247 |
18-Oct-2024 05:30 PM |
31-Oct-2024 03:00 PM |
01-Nov-2024 11:00 AM |
[CREATION/UPGRADATION OF ELECTRICAL INFRASTRUCTURE UNDER PRI GRANTS IN ED ANANTNAG-4 WORKS]
[56/EDA OF 2024-25][2024_PDD_261148_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
248 |
18-Oct-2024 05:20 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 01:00 PM |
[SUPPLY OF TRANSFORMER OIL IN ELECTRIC DIVISION RAJOURI.]
[EDR/32 of 2024-25 Dated 18.10.2024][2024_PDD_261139_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Rajouri |
249 |
18-Oct-2024 05:00 PM |
30-Oct-2024 04:00 PM |
31-Oct-2024 02:00 PM |
[Improvement of HT LT network at Shiva, Shiva Nashla, Shararna, Shararna Dharara, Shararna Gangatha, Jadhpur B Kasheran, Hanch Battal Kasheran under PRI]
[ ED Doda/JPDCL/26 of 2024-25][2024_PDD_261125_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
250 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA Hamnadi Kashmiri Basti sheikhpora]
[EDB/e-tender/ 64 of 2024-25 ][2024_PDD_261013_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
251 |
18-Oct-2024 05:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Improvement of LT Network ( SE North ) Electric Division Sopore/ Baramulla ( DDC Share) Under DDC Grants 2024-25]
[EMDS/149][2024_PDD_258665_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
252 |
18-Oct-2024 05:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Improvement of LT Network ( SE North ) Electric Division Sopore/ Baramulla ( DDC Share) Under DDC Grants 2024-25]
[EMDS/131][2024_PDD_258625_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
253 |
18-Oct-2024 05:00 PM |
31-Oct-2024 03:00 PM |
01-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS AND IMPROVEMENT OF LT NETWORK AT VARIOUS LOCATIONS AS PER WORK LIST UNDER PRI FALLING IN THE JURIDGICTION OF ED ANANTNA]
[54/EDA OF 2024-25][2024_PDD_261136_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
254 |
18-Oct-2024 05:00 PM |
31-Oct-2024 03:00 PM |
01-Nov-2024 11:00 AM |
[CREATION/UPGRADATION OF ELECTRICAL INFRASTRUCTURE UNDER PRI GRANTS IN ED ANANTNAG-4 WORKS]
[53/EDA OF 2024-25][2024_PDD_261122_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
255 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA Transformer Adlash Voodipora]
[EDB/e-tender/ 64 of 2024-25][2024_PDD_261058_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
256 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA Sofi Mohalla Khiram Near EDB]
[EDB/e-tender/ 64 of 2024-25][2024_PDD_261047_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
257 |
18-Oct-2024 05:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Creation of 63 KVA sub station along with HT/LT network at Tarzoo C Under PRI Grants 2024-25]
[EMDS/100][2024_PDD_258588_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
258 |
18-Oct-2024 05:00 PM |
08-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[Annual Rate Contract for Repair of LIPI Line Printers Servers CPUs UPS and other spare items]
[e NIT 01 of 2024-25 Dated 18-10-2024][2024_PDD_261000_1]
|
DC-PDD||CE-M and RE Wing Jammu |
259 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation 63 kv Transformer at Poswal Mahallah Grandwan]
[EDB/e-tender/ 65 of 2024-25][2024_PDD_261088_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
260 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA at Sofipora Near Graveyard]
[EDB/e-tender/ 64 of 2024-25 ][2024_PDD_260986_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
261 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA SHEIKHMOHALLA DACHIGAM Budroo]
[EDB/e-tender/ 64 of 2024-25][2024_PDD_260992_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
262 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA Hardu Kathal NHO Ali Mohd Bhat Hardikuthal]
[EDB/e-tender/ 64 of 2024-25][2024_PDD_260996_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
263 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63KVA sub station at main road NHO Gh Mohd mir at Dangipora Mirpora salia]
[EDB/e-tender/ 64 of 2024-25 ][2024_PDD_261073_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
264 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA sub station at Wanbear Brad]
[EDB/e-tender/ 65 of 2024-25 ][2024_PDD_261081_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
265 |
18-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Improvement of HT LT Network for ED Kulgam under UT Capex Budget 2024-25]
[EDK/e-tender/19 of 2024-25][2024_PDD_261084_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
266 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation 63 kv Transformer at Reshkulbal Cheechi Mahalla]
[EDB/e-tender/ 65 of 2024-25][2024_PDD_261113_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
267 |
18-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Installation of 5 poles alongwith conductor near the house of Adil Ahmad Baba at Village Dalwatch Gagsigund 4 poles alongwith conductor near the house of Dr. Ashiq Hussain at Wani Mohalla Ahmadpora Mirbazar for ED Kulgam]
[EDK/e-tender/19(02) of 2024-25][2024_PDD_261097_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
268 |
18-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation 63 kv Transformer at Yall]
[EDB/e-tender/ 65 of 2024-25][2024_PDD_261102_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
269 |
18-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Replacement of bare conductor by LT AB Cable for ED Kulgam under UT Capex Budget 2024-25]
[EDK/e-tender/19(03) of 2024-25][2024_PDD_261105_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
270 |
18-Oct-2024 05:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of 100kv transformer owais mohalla amberpora tarzoo B Under PRI Grants 2024-25]
[EMDS/99][2024_PDD_261107_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
271 |
18-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Replacement of bare conductor by LT AB Cable for ED Kulgam under UT Capex Budget 2024-25]
[EDK/e-tender/19(4) of 2024-25][2024_PDD_261117_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
272 |
18-Oct-2024 05:00 PM |
30-Oct-2024 04:00 PM |
31-Oct-2024 02:00 PM |
[Improvement of HT LT network at Dugli, Dugli B,Rewara, Shangroo, and Trown under PRI]
[ ED Doda/JPDCL/25 of 2024-25][2024_PDD_261111_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||ED-Doda |
273 |
18-Oct-2024 04:30 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Creation of 63 KVA sub station at ward no. 9 Dug Mohalla Tarzoo B Under PRI Grants 2024-25]
[EMDS/98][2024_PDD_258586_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
274 |
18-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of two no. 63KV sub stations at Shurgari Mohalla and Syed colony Tarzoo A Under PRI Grants 2024-25]
[EMDS/97][2024_PDD_258585_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
275 |
18-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Creation of 63 KVA sub station along with HT/LT network at Kuloo Mohalla Rakh Hygam Under PRI Grants 2024-25]
[EMDS/94][2024_PDD_258559_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
276 |
18-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of electric poles at different spots at Wagub Under PRI Grants 2024-25]
[EMDS/86][2024_PDD_258550_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
277 |
18-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of LT poles at differfent spots at Krankshuan Under PRI Grants 2024-25]
[EMDS/84][2024_PDD_258548_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
278 |
18-Oct-2024 04:00 PM |
08-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[LT Power supply to newly constructed BSNL USOF site at Laridoora of ESD Baramulla 1st.]
[EDB/83][2024_PDD_260983_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
279 |
18-Oct-2024 04:00 PM |
08-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[LT Power supply to newly constructed BSNL USOF site at Bardian ESD Mohura]
[EDB/82][2024_PDD_260980_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
280 |
18-Oct-2024 04:00 PM |
08-Nov-2024 03:00 PM |
09-Nov-2024 03:00 PM |
[Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Creation of 63 kVA S.S alongwith erection of 11KV line on 9 mtr. PCC Poles, 30mmSq. ACSR Weasel conductor, LT Line on 8mtr. PCC Poles at Village Rakh Sansoo for SKUAST]
[ED/UDH/21 of 2024-25 dt. 17-10-2024][2024_PDD_261064_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
281 |
18-Oct-2024 04:00 PM |
06-Nov-2024 04:00 PM |
07-Nov-2024 01:00 PM |
[Installation of HT/LT Poles at Wayil Wooder]
[EDG/V/082 OF 2024-25][2024_PDD_261011_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
282 |
18-Oct-2024 04:00 PM |
08-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[LT Power supply to newly constructed BSNL USOF site at Dodhbug of ESD Wagoora.]
[EDB/85][2024_PDD_260991_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
283 |
18-Oct-2024 04:00 PM |
06-Nov-2024 04:00 PM |
07-Nov-2024 01:00 PM |
[Installation of HT/LT Poles at Gutlibagh]
[EDG/V/083 OF 2024-25][2024_PDD_261071_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
284 |
18-Oct-2024 04:00 PM |
06-Nov-2024 04:00 PM |
07-Nov-2024 01:00 PM |
[Installation of LT Poles with Wire at Bonizil/ Machan Panchayat Halqa Bonizil]
[EDG/V/084 OF 2024-25][2024_PDD_261079_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
285 |
18-Oct-2024 04:00 PM |
08-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[ LT Power supply to newly constructed BSNL USOF site at Takiasultan of ESD Baramulla 2nd.]
[EDB/84][2024_PDD_260989_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
286 |
18-Oct-2024 03:30 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 10:30 AM |
[Shifting of HT line of Feeder-5 of Receiving Silk Factory and Feeder-2 Rajbagh to pave way for Modification of Main Entrance Gate complex at Tulsibagh by Estates Division, Srinagar (DC Work)]
[ED-II/14 of 2024-25 Dated 17/10/24][2024_PDD_261054_2]
|
DC-PDD||CE-M and RE Wing Kashmir |
287 |
18-Oct-2024 03:00 PM |
08-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[Supply, Erection, Testing, Commissioning for Creation of 250 KVA Substation alongwith laying of HT and LT Line at Gulshan Nagar Sidhra, Jammu under the Jurisdiction of Electric Division Div-I (JPDCL) Jammu on Turn Key Basis]
[ED-I/e-NIT/32 of 2024-25 Dated 18/10/2024][2024_PDD_261042_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-I Jammu |
288 |
18-Oct-2024 02:00 PM |
15-Nov-2024 01:00 PM |
16-Nov-2024 02:00 PM |
[Stabilization/Improvement of 33 KV Lassipora Pulwama Line from Circular Road Pulwama to Rec Station Pulwama under Scheme Augmentation of 33kV Lines / New Lines PDDSS2021101363]
[STD/PUL/13 OF 2024-25 DATED 18/10/2024][2024_PDD_261008_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
289 |
18-Oct-2024 01:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Buffer Stock of Transfarmers at Block level Under PRI Grants 2024-25]
[EMDS/87][2024_PDD_258551_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
290 |
18-Oct-2024 12:00 PM |
07-Nov-2024 03:00 PM |
08-Nov-2024 03:00 PM |
[Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Electrification of leftout un-electrified households in Block Moungri under Aspirational Plan on turnkey basis. ]
[ED/UDH/20 of 2024-25 dt. 17-10-2024][2024_PDD_260975_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
291 |
18-Oct-2024 12:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 01:00 PM |
[SUPPLY INSTALLATION TESTING COMMISSIONING OF 58.8 KVA DG SET AT DC OFFICE RAJOURI]
[EDR/31 of 2024-25 Dated 17.10.2024][2024_PDD_260988_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Rajouri |
292 |
18-Oct-2024 09:00 AM |
31-Oct-2024 05:00 PM |
01-Nov-2024 05:00 PM |
[FINDC2425102180 Installation of 2 No. transformers 63 KV at Achoora]
[EDbpr 16 of 2024-25][2024_PDD_260898_2]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
293 |
18-Oct-2024 09:00 AM |
07-Nov-2024 02:00 PM |
08-Nov-2024 02:00 PM |
[Shifting of 100 KVA Sub Station at Amirabad Vijhara along with HT LT]
[EDBpr/11 of 2024-25 Dated 161024 ][2024_PDD_260535_2]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
294 |
18-Oct-2024 09:00 AM |
31-Oct-2024 04:00 PM |
01-Nov-2024 04:00 PM |
[PLNDC2425100154 Providing of Power to IPD Block CHC Dawar]
[EDbpr 15 of 2024-25][2024_PDD_260871_2]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
295 |
18-Oct-2024 09:00 AM |
18-Nov-2024 03:00 PM |
20-Nov-2024 11:00 AM |
[Construction of New 33 by11 KV one 6.3 MVA SS in Tulail alongwith 33 KV and 11 KV feeder network under RDSS]
[CE/P/KPDCL/RDSS/03 of 2024-25][2024_PDD_260877_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
296 |
18-Oct-2024 09:00 AM |
08-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[Providing of Electricity to the Guest House of Achoorra and Bagtore]
[EDBpr 13 of 2024-25][2024_PDD_260694_2]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
297 |
18-Oct-2024 09:00 AM |
07-Nov-2024 02:00 PM |
08-Nov-2024 02:00 PM |
[HMESS2324100434 Creation of 100 KVA Sub Station along with HT/LT network]
[EDBpr 12 of 2024-25][2024_PDD_260684_2]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
298 |
17-Oct-2024 06:00 PM |
09-Nov-2024 03:00 PM |
11-Nov-2024 02:00 PM |
[Providing, Installation, Testing and Commissioning of 1x50 KVA, 3-Phase , Digital Microcontroller based Servo Automatic Voltage stabilizer at Primary Health Centre Maira Mandrian under DDC Component 2024-25]
[ED-III Jammu/45 of 2024-25][2024_PDD_260855_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-III Jammu |
299 |
17-Oct-2024 06:00 PM |
18-Nov-2024 03:00 PM |
20-Nov-2024 02:00 PM |
[Electrification of UE Households of District Kupwara under RDSS]
[CE/P/KPDCL/RDSS/01 of 2024-25][2024_PDD_260845_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
300 |
17-Oct-2024 05:00 PM |
30-Oct-2024 03:00 PM |
31-Oct-2024 11:00 AM |
[CREATION/UPGRADATION OF ELECTRICAL INFRASTRUCTURE UNDER PRI GRANTS IN SUB DIVISION ACHABAL]
[EDA/50 OF 2024-25][2024_PDD_260866_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
301 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Construction of 100 KW transformer at Kharpora ward I Seligam]
[EDB/e-tender/ 62 of 2024-25][2024_PDD_260755_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
302 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Installation of Transformer HT and LT Wire Pols at Kamenwan Vail, Nagbal B]
[EDB/e-tender/ 62 of 2024-25][2024_PDD_260763_2]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
303 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation Installation of 63KVA sub-station at Padder Mohallah Yanned A]
[EDB/e-tender/ 62 of 2024-25 ][2024_PDD_260787_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
304 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[LT improvement whole Pahalgam Block and Sheikhpora Bumla Mohalla ]
[EDB/e-tender/ 63 of 2024-25 ][2024_PDD_260853_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
305 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63KVA transformer Masjid Nard Sheikhmohalla Lehandagan]
[EDB/e-tender/ 63 of 2024-25 ][2024_PDD_260859_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
306 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63KVA transformer at Ganie Mohalla Katsoo]
[EDB/e-tender/ 63 of 2024-25][2024_PDD_260874_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
307 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA Rawak Pora Budroo]
[EDB/e-tender/ 63 of 2024-25][2024_PDD_260884_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
308 |
17-Oct-2024 05:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Installation of additional 10MVA Power Transformer at 66/11KV Receiving Station, GHAGWAL in Respect of STD Kathua]
[e-NIT/2024-25/05 Dated 17.10.2024][2024_PDD_260882_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||STD-III Kathua |
309 |
17-Oct-2024 05:00 PM |
30-Oct-2024 03:00 PM |
31-Oct-2024 11:00 AM |
[CREATION/UPGRADATION OF ELECTRICAL INFRASTRUCTURE UNDER PRI GRANTS IN SUB DIVISION ACHABAL]
[51/EDA OF 2024-25][2024_PDD_260893_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
310 |
17-Oct-2024 05:00 PM |
30-Oct-2024 03:00 PM |
31-Oct-2024 11:00 AM |
[CREATION OF ELECTRICAL INFRASTRUCTURE UNDER PRI GRANTS IN SUB DIVISION ACHABAL]
[52/EDA OF 2024-25][2024_PDD_260907_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
311 |
17-Oct-2024 05:00 PM |
31-Oct-2024 03:00 PM |
01-Nov-2024 11:00 AM |
[CREATION OF SUB STATIONS AND IMPROVEMENT OF LT NETWORK AT VARIOUS LOCATIONS AS PER WORK LIST UNDER BDC FALLING IN THE JURIDICTION OF ED ANANTNAG]
[49/EDA OF 2024-25][2024_PDD_260809_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
312 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Transformer new 63KVA at Badigam near Janazgah Badigam]
[EDB/e-tender/ 62 of 2024-25][2024_PDD_260799_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
313 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Providing of Transformer at Peer Mohallah Panzmullah]
[EDB/e-tender/ 62 of 2024-25][2024_PDD_260749_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
314 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[63 KV New creation along with HT LT at Sikh Mohallah NHO Master Dara Singh Nowgam Lower B]
[EDB/e-tender/ 62 of 2024-25][2024_PDD_260742_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
315 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA Kanteng Colony Sirhama]
[EDB/e-tender/ 63 of 2024-25][2024_PDD_260843_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
316 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63KVA transformer Liver Banpora Near Masjid Shareef]
[EDB/e-tender/ 63 of 2024-25][2024_PDD_260846_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
317 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[63 KV New creation along with HT LT at Naikoo Mohallah Chanigam Nowgam Lower B]
[EDB/e-tender/ 62 of 2024-25][2024_PDD_260733_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
318 |
17-Oct-2024 05:00 PM |
05-Nov-2024 01:00 PM |
06-Nov-2024 01:00 PM |
[Installation Electric poles LT at different Spots Bijbehara]
[EDB/e-tender/ 63 of 2024-25 ][2024_PDD_260834_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
319 |
17-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of 63 KV transformer at New Colony Khambyar Under PRI Grants 2024-25]
[EMDS/76][2024_PDD_258540_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
320 |
17-Oct-2024 04:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[Improvement of LT net work ( Rafiabad ) DDC 2024-25]
[EDB/78][2024_PDD_260724_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
321 |
17-Oct-2024 04:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[Providing of street lights for specific places at DDC constituency Rohama (PDD Div Baramulla) DDC 2024-25]
[EDB/79][2024_PDD_260730_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
322 |
17-Oct-2024 04:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[Imprvement of LT Network for DDC Constitunect Rohoma DDC 2024-25]
[EDB/80][2024_PDD_260731_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
323 |
17-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of63 KV transformer at Shah Hamidan Colony Nillahpalpora Under PRI Grants 2024-25]
[EMDS/61][2024_PDD_260844_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
324 |
17-Oct-2024 04:00 PM |
31-Oct-2024 04:00 PM |
02-Nov-2024 01:00 PM |
[Creation of 63 KVA Feasible Substation at Baba Mohalla Watalbagh Manigam ]
[EDG/V/079 OF 2024-25][2024_PDD_260819_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
325 |
17-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of 63-KV Transformer at Khan Mohalla Tilgam-B Under PRI Grants 2024-25]
[EMDS/74][2024_PDD_258534_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
326 |
17-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of 63KV Transformer at Danger Mohalla near Masjid Sharief at Tilgam-A Under PRI Grants 2024-25]
[EMDS/73][2024_PDD_258533_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
327 |
17-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of 63 KV transformer at Ganie Mohalla and Alahi Mohalla Under PRI Grants 2024-25]
[EMDS/57][2024_PDD_258504_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
328 |
17-Oct-2024 04:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[Extention of 11 KV network upto Sikh and Kumar Mohalla and 63 KV transformer at Tangmulla DDC 2024-25]
[EDB/76][2024_PDD_260718_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
329 |
17-Oct-2024 04:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[ Creation of63 transformer at Rather and sheikh Mohalla at Chatoosa DDC 2024-25]
[EDB/77][2024_PDD_260723_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
330 |
17-Oct-2024 04:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[Improvement and Extension of LT/ HT netwrok at different spots of Narwah DDC 2024-25]
[EDB/72][2024_PDD_260710_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
331 |
17-Oct-2024 04:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[4 No of LT poles and HT at Satrina near Gurdwara DDC 2024-25]
[EDB/75][2024_PDD_260716_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
332 |
17-Oct-2024 04:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[Providing LT Line with wire at Batakot ward 6 Gawalata DDC 2024-25]
[EDB/74][2024_PDD_260713_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
333 |
17-Oct-2024 04:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[Providing of LT Poles ,Wire, to syed Mohalla ward 2 Parenpilan DDC 2024-25]
[EDB/73][2024_PDD_260712_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
334 |
17-Oct-2024 04:00 PM |
06-Nov-2024 04:00 PM |
07-Nov-2024 01:00 PM |
[Provision of Electric Poles and wires for already existing 63 KVA transformer at Dar Mohalla Panchayat Halqa Shahpora]
[EDG/V/080 OF 2024-25][2024_PDD_260852_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
335 |
17-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Creation of 63kv transformer NHO Fida malik at Mirgund-A Under DDC Grants 2024-25]
[EMDS/132][2024_PDD_260868_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
336 |
17-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Upgradation of Transformer at Rather Mohalla Tilgam B Under DDC Grants 2024-25]
[EMDS/123][2024_PDD_258617_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
337 |
17-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Creation of 63kv transformer NHO hilal Ahmad dar s/o mohd qasim at Gundi ibrahim. Under DDC Grants 2024-25]
[EMDS/133][2024_PDD_258628_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
338 |
17-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Supply of Allied Material and TandP Items required for Reclamation-Repair of Damaged DT of various capacities ranging from 25 KVA to 800 KVA in ECWD, Jammu]
[ECWD-J-05 of 2024 Dated 17-10-2024][2024_PDD_260858_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||Central Workshop Jammu |
339 |
17-Oct-2024 04:00 PM |
06-Nov-2024 04:00 PM |
07-Nov-2024 01:00 PM |
[Installation of 100 KVA transformer for Tilwani Mohalla Shuhama (Near Bridge)]
[EDG/V/081 OF 2024-25][2024_PDD_260876_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
340 |
17-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Repair-Reclamation of Damaged DT of different capacities viz 25 KVA, 50-63 KVA, 100 KVA, 200-250 KVA, 300-400 KVA, 500-630 KVA and 800 KVA at ECWD, Jammu]
[ECWD-J-Repair of DTs-04 of 2024][2024_PDD_260604_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||Central Workshop Jammu |
341 |
17-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
08-Nov-2024 01:00 PM |
[shifting of 400KVA Distribution Transformer at Doordarshan Kendra at Nawa I Subh Srinagar]
[E NIT NO 043 OF ED-I][2024_PDD_260881_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
342 |
17-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 02:00 PM |
[Providing of 11kV and 33 kV CT and PT operated HE metering in 33 kV and 11 kV sub stations at STC Humhama, Srinagar JK.]
[EDB/82 OF 2024-25][2024_PDD_260665_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
343 |
17-Oct-2024 04:00 PM |
09-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Installation of 63 KV transformer near Jamia Masjid Parpora Under PRI Grants 2024-25]
[EMDS/49][2024_PDD_257128_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
344 |
17-Oct-2024 03:55 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 10:30 AM |
[Upgradation/Face-lifting of stalls at Kashmir Haat, Srinagar (Replacement of Damaged 11 KV 50 mm sq 3-core AB cable of Dedicated 100 kVA DT of Director Handicrafts at PCR fed from F1-Exhibition-Installation of HT Cable)]
[ED-II/13 of 2024-25 Dated 17/10/24][2024_PDD_260880_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
345 |
17-Oct-2024 03:00 PM |
18-Nov-2024 03:00 PM |
20-Nov-2024 02:00 PM |
[Electrification of UE Households for Tulail and Kanzalwan of District Bandipora under RDSS]
[CE/P/KPDCL/RDSS/02 of 2024-25][2024_PDD_260750_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
346 |
17-Oct-2024 02:00 PM |
06-Nov-2024 04:00 PM |
07-Nov-2024 04:00 PM |
[Creation/ augmentation of feasible Sub Station( Creation of63kVA Sub Station at Machikrand Ward No 09) under UT capex 2024-25]
[EDB/81][2024_PDD_260781_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
347 |
17-Oct-2024 01:15 PM |
02-Nov-2024 12:00 PM |
02-Nov-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[EDA-19 of 2024-25 dated 16-10-2024][2024_PDD_260788_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
348 |
17-Oct-2024 12:55 PM |
02-Nov-2024 12:00 PM |
02-Nov-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[EDA-18 of 2024-25 dated 16-10-2024][2024_PDD_260775_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
349 |
17-Oct-2024 12:45 PM |
02-Nov-2024 12:00 PM |
02-Nov-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[EDA-17 of 2024-25 dated 16-10-2024][2024_PDD_260762_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
350 |
17-Oct-2024 12:20 PM |
02-Nov-2024 12:00 PM |
02-Nov-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[EDA-16of2024-25 dated 16-10-2024][2024_PDD_260751_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
351 |
17-Oct-2024 10:00 AM |
31-Oct-2024 04:00 PM |
02-Nov-2024 03:00 PM |
[Development of land ]
[STD/Doda/Capex /15][2024_PDD_260650_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||STD-Doda |
352 |
17-Oct-2024 10:00 AM |
31-Oct-2024 04:00 PM |
02-Nov-2024 03:00 PM |
[CREATION OF RECEIVING STATION ]
[STD/Doda/Capex/14 of 2024-25 ][2024_PDD_260501_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kishtwar||STD-Doda |
353 |
16-Oct-2024 06:50 PM |
08-Nov-2024 02:00 PM |
09-Nov-2024 12:00 PM |
[Purchase of LT AB cable 70 sqmm with bare messenger wire]
[SE/PRJ/12/2024-25 Dated 16.10.2024][2024_PDD_260537_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
354 |
16-Oct-2024 06:00 PM |
06-Nov-2024 02:00 PM |
08-Nov-2024 02:00 PM |
[e-NIT/2024-25/04 Dated 16.10.2024]
[e-NIT/2024-25/04 Dated 16.10.2024][2024_PDD_259093_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||STD-III Kathua |
355 |
16-Oct-2024 06:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 02:00 PM |
[Shifting of 33KV Gho Manhasan to Shahzadpur Line on 11Mtr ST Poles Panther Conductor 4 Km in respect of STD-I, JPDCL Jammu]
[e NIT 25 of 2024][2024_PDD_260617_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||STD-I Jammu |
356 |
16-Oct-2024 06:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 01:00 PM |
[Installation of 63 Kva Transformer ( Buffer Stock) at Sariwarpora A]
[E-NIT No.SSDT/21 of 2024-25,Dated 16/10/2024][2024_PDD_260609_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
357 |
16-Oct-2024 06:00 PM |
06-Nov-2024 02:00 PM |
07-Nov-2024 01:00 PM |
[Installation of 63 Kva Sub Station at Ward No. 02 Mughalpora]
[E-NIT No.SSDT/20 of 2024-25,Dated 16/10/2024][2024_PDD_260591_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
358 |
16-Oct-2024 05:55 PM |
31-Oct-2024 11:00 AM |
31-Oct-2024 02:00 PM |
[ CREATION / REPLACEMENT / LT IMPROVEMENT AT VARIOUS LOCATIONS AT DISTRICT SHOPIAN]
[EDS/E-TENDER/21 OF 2024-25 DATED 16-10-2024][2024_PDD_260657_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
359 |
16-Oct-2024 05:00 PM |
02-Nov-2024 01:00 PM |
04-Nov-2024 01:00 PM |
[Installation of electricity transformer at Reshidankard ward no 2,3 Waghama Bala]
[EDB/e-tender/ 61 of 2024-25 ][2024_PDD_260545_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
360 |
16-Oct-2024 05:00 PM |
30-Oct-2024 03:00 PM |
31-Oct-2024 11:00 AM |
[LT IMPROVEMENT AT RANBIRPORA,HUTMARA AND DEATHU ]
[46/EDA OF 2024-25][2024_PDD_260538_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
361 |
16-Oct-2024 05:00 PM |
02-Nov-2024 01:00 PM |
04-Nov-2024 01:00 PM |
[Creation of 63KVA Substation at Mir Mohalla near Public Park Old Patwar Khana Sirhama]
[EDB/e-tender/ 60 of 2024-25][2024_PDD_260441_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
362 |
16-Oct-2024 05:00 PM |
02-Nov-2024 01:00 PM |
04-Nov-2024 01:00 PM |
[C O Transformer with wire poles at Khatana Mohala, Merlo mohalla and Bent Mohalla sheikpora]
[EDB/e-tender/ 60 of 2024-25][2024_PDD_260426_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
363 |
16-Oct-2024 05:00 PM |
30-Oct-2024 03:00 PM |
31-Oct-2024 11:00 AM |
[CREATION OF SUB STATIONS AND IMPROVEMENT OF LT NETWORK AT VARIOUS LOCATIONS AS PER WORK LIST UNDER ABDP FALLING IN THE JURIDICTION OF ED ANANTNAG]
[48/EDA OF 2024-25][2024_PDD_260614_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
364 |
16-Oct-2024 05:00 PM |
02-Nov-2024 01:00 PM |
04-Nov-2024 01:00 PM |
[Creation of 63KVA sub Station at Kullar Batpora Kullar Payeen]
[EDB/e-tender/ 60 of 2024-25][2024_PDD_260467_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
365 |
16-Oct-2024 05:00 PM |
02-Nov-2024 01:00 PM |
04-Nov-2024 01:00 PM |
[Installation of transformer at with poles and wire at Pandit Mohalla Sallar B]
[EDB/e-tender/ 60 of 2024-25][2024_PDD_260413_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
366 |
16-Oct-2024 05:00 PM |
31-Oct-2024 12:00 PM |
31-Oct-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[EDA-NIT 15 of 2024-25 dated 16-10-2024][2024_PDD_260639_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
367 |
16-Oct-2024 05:00 PM |
02-Nov-2024 01:00 PM |
04-Nov-2024 01:00 PM |
[Creation of 63 KVA sub Sitation at Gurlam Vidday]
[EDB/e-tender/ 61 of 2024-25][2024_PDD_260566_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
368 |
16-Oct-2024 05:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 01:00 PM |
[REPAIR AND RENNOVATION OF EXISTING OFFICE BUILDING OF JPDCL ELECTRIC SUB DIVISION RAJOURI -I AND KOTRANKA]
[EDR/30 of 2024-25 Dated 16.10.2024][2024_PDD_260634_1]
|
DC-PDD||CE-M and RE Wing Jammu||Rajouri||ED-Rajouri |
369 |
16-Oct-2024 05:00 PM |
30-Oct-2024 03:00 PM |
31-Oct-2024 11:00 AM |
[LT IMPROVEMENT AT SHISTERGAM, HILLER AND PATHBOOK UNDER DDC GRANTS FALLING IN THE JURIDUCTION OF ED ANANTNAG (SUB DIVISION DOORU)]
[47/EDA OF 2024-25][2024_PDD_260583_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
370 |
16-Oct-2024 05:00 PM |
31-Oct-2024 11:00 AM |
31-Oct-2024 02:00 PM |
[STABILIZATION / CREATION OF SUB STATION AT VARIOUS LOCATIONS IN THE JURISDICTION OF KPDCL SD CHITRAGAM UNDER PRI AND DDC GRANTS]
[EDS/E-TENDER/20 OF 2024-25 DATED 16-10-2024][2024_PDD_260579_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
371 |
16-Oct-2024 05:00 PM |
02-Nov-2024 01:00 PM |
04-Nov-2024 01:00 PM |
[Upgradation of Transformer to 100 kv from 63 kv with Electric poles and wire at Tarray Mohalla Sheikh mohalla Viddy]
[EDB/e-tender/ 61 of 2024-25 ][2024_PDD_260559_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
372 |
16-Oct-2024 05:00 PM |
02-Nov-2024 01:00 PM |
04-Nov-2024 01:00 PM |
[Installation of 100 KV transformer as Bonpora Shoul]
[EDB/e-tender/ 60 of 2024-25][2024_PDD_260496_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
373 |
16-Oct-2024 04:45 PM |
31-Oct-2024 12:00 PM |
31-Oct-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[EDA-NIT 14 of 2024-25 Dated 16-10-2024][2024_PDD_260626_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
374 |
16-Oct-2024 04:20 PM |
31-Oct-2024 12:00 PM |
31-Oct-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[EDA-13 of 2024-25 dated 16-10-2024][2024_PDD_260612_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
375 |
16-Oct-2024 04:00 PM |
31-Oct-2024 12:00 PM |
31-Oct-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[NIT 12 of 2024-25 Dated 16-10-2024][2024_PDD_260588_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
376 |
16-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Augmentation / Creation of sub stations for critically overloaded DTs winter preparedness Part 3 ( Creation of 100KVA Sub-Station at Rehmatabad ) under UT Capex 2024-25]
[EMDS/165][2024_PDD_260410_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
377 |
16-Oct-2024 04:00 PM |
06-Nov-2024 03:00 PM |
08-Nov-2024 03:00 PM |
[Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Installation of 100 KVA Sub station alongwith erection of 11 KV Line on 9 mtr. ST poles, 30mm Sq ACSR Weasel conductor LT line on 8 mtr. ST pole at WSS KAWA under JJM]
[Ed/Udh/19 of 2024-25 dt. 16-10-2024][2024_PDD_260539_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
378 |
16-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Shifting and Replacement of 20 MVA Transformer spare from Jourian to Grid Sub Station Rajouri]
[TLMD-VIII/J/T/10 of 2024-25 dated 15.10.2024][2024_PDD_260518_1]
|
DC-PDD||CE-S and O Wing Jammu||CIRCLE II-Jammu||TLCD-I Jammu |
379 |
16-Oct-2024 04:00 PM |
05-Nov-2024 04:00 PM |
06-Nov-2024 01:00 PM |
[Installation of HT Poles at Kangan B]
[EDG/V/077 OF 2024-25][2024_PDD_260527_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
380 |
16-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Augmentation / Creation of sub stations for critically overloaded DTs winter preparedness Part 4 ( Augmentation of 100KVA to 200KVA at Warpora ) under UT Capex 2024-25]
[EMDS/166][2024_PDD_260415_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
381 |
16-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[R and M of Distribution of sub station (within the Jurisdiction of ED Sopore) under UT Capex 2024-25]
[EMDS/162][2024_PDD_260404_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
382 |
16-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
06-Nov-2024 02:00 PM |
[Supply and Replacement of 2 No. set 33 KV Current Transformer and 1 no. set 132 KV Current Transformer at Grid Station Bishnah]
[E-NIT no TLMD-VIII/J/T/09 of 2024-25 dt-14/10/2024][2024_PDD_260040_1]
|
DC-PDD||CE-S and O Wing Jammu||CIRCLE II-Jammu||TLCD-I Jammu |
383 |
16-Oct-2024 04:00 PM |
05-Nov-2024 04:00 PM |
06-Nov-2024 01:00 PM |
[Installation of Electric Streetlights at DDC Constituency Ganderbal A]
[EDG/V/078 OF 2024-25][2024_PDD_260546_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
384 |
16-Oct-2024 04:00 PM |
08-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[Execution of different HT/LT improvement works with in the jurisdiction of Electric Division -III Jammu under UT Capex Budget for the year 2024-25.Scheme Code PDDSS2425100411]
[ED-III/Jammu/44 of 2024-25 ][2024_PDD_260541_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-III Jammu |
385 |
16-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Augmentation / Creation of sub stations for critically overloaded DTs winter preparedness Part 2 ( Augmentation of 100KVA to 200KVA at Haritar) under UT Capex 2024-25]
[EMDS/164][2024_PDD_260407_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
386 |
16-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Augmentation / Creation of sub stations for critically overloaded DTs winter preparedness Part 1 (Creation of 100KVA Sub-station at Palhallan Mode) under UT Capex 2024-25]
[EMDS/163][2024_PDD_260405_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
387 |
16-Oct-2024 04:00 PM |
05-Nov-2024 04:00 PM |
06-Nov-2024 01:00 PM |
[Shifting of HT Poles Line at Tunnel Patti Near H/o Mumtaaz Ahmed Kasana at Hariganiwan]
[EDG/V/075 OF 2024-25][2024_PDD_260446_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
388 |
16-Oct-2024 04:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Augmentation / Creation of sub stations for critically overloaded DTs winter preparedness Part 5 ( Creation of 100KVA Transformer at Ningli Bala Tarzoo ) under UT Capex 2024-25]
[EMDS/167][2024_PDD_260540_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
389 |
16-Oct-2024 04:00 PM |
31-Oct-2024 04:00 PM |
01-Nov-2024 02:30 PM |
[Augmentation of conductor of 33 kV Wanpoh-Sicop line from 100 mmsq to 200 mmsq ACSR for 5 ckm and twining of 100 mmsq ACSR for 3 ckm including stabilisation and construction of LILO along Canal road Sicop]
[STB/eNIT/ 19 of 2024-25 Dt.16.10.2024][2024_PDD_260507_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
390 |
16-Oct-2024 04:00 PM |
05-Nov-2024 04:00 PM |
06-Nov-2024 01:00 PM |
[Installation of HT/LT Line alongwith Poles from H/O Subhan Khan to H/o Mohd Sultan Lone at Benhama Ganderbal]
[EDG/V/076 OF 2024-25][2024_PDD_260473_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
391 |
16-Oct-2024 04:00 PM |
05-Nov-2024 04:00 PM |
06-Nov-2024 01:00 PM |
[Improvement of LT Poles at Kaniwas Pati Sumbal, Kullan and Sonamarg B.]
[EDG/V/074 OF 2024-25][2024_PDD_260420_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
392 |
16-Oct-2024 03:30 PM |
06-Nov-2024 04:00 PM |
11-Nov-2024 02:00 PM |
[Replacement of 33KV VCBs and 1 set of CTs at 132/33KV Grid Station Sidhra]
[TLMD-V/J/ 20 of 2024-25 Dated 16/10/2024][2024_PDD_260549_1]
|
DC-PDD||CE-S and O Wing Jammu||CIRCLE II-Jammu||TLCD-II Jammu |
393 |
16-Oct-2024 03:25 PM |
31-Oct-2024 12:00 PM |
31-Oct-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[NIT 11 OF 2024-25 DATED 16-10-2024][2024_PDD_260558_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
394 |
16-Oct-2024 03:00 PM |
31-Oct-2024 04:00 PM |
02-Nov-2024 10:30 AM |
[Augmentation of existing 25 kVA Sub-Station (DT Code 219) to 63 kVA Sub-Station to accommodate New Connections at Tawheedabad, Humhama, Srinagar (ESD-Baghat) under Capex Budget 2024-25 PDDSS2022100301]
[ED-II/12 of 2024-25 Dated 16/10/2024][2024_PDD_260534_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
395 |
16-Oct-2024 02:40 PM |
31-Oct-2024 12:00 PM |
31-Oct-2024 03:00 PM |
[Improvement of Power Infrastructure under DDC and PRI Grants 2024-25 in KPDCL Division Awantipora]
[EDA-10 of2024-25 dated 16-10-2024][2024_PDD_260517_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
396 |
16-Oct-2024 02:00 PM |
08-Nov-2024 02:00 PM |
11-Nov-2024 02:00 PM |
[Twining of 132kV Main Reserve Bus Bars, Quadrupling of main reserve 33kV bus at Grid Station Kulgam Replacement of two numbers 33kV VCB 1250A by 1600A breaker Replacement of 06 Number 33kV CTs by 800-1200-1600/1A]
[eNIT NO.TLMD-VI/07 OF 2024-25 DATED 16-10-2024][2024_PDD_260488_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-I Srinagar |
397 |
16-Oct-2024 02:00 PM |
04-Nov-2024 01:00 PM |
05-Nov-2024 02:00 PM |
[Stabilization and Improvement of 33kV Lines of District Pulwama and Shopian of STD Pulwama PDDSS2425100001]
[STD/PUL/12 OF 2024-25 DATED 16/10/2024][2024_PDD_260505_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
398 |
16-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation of 63 KVA Sub Station at Pethbugh near H/O Gh Mohd Wagey.. Under DDC Grants 2024-25]
[EMDS/141][2024_PDD_258636_2]
|
DC-PDD||CE-M and RE Wing Kashmir |
399 |
16-Oct-2024 10:00 AM |
04-Nov-2024 01:00 PM |
05-Nov-2024 02:00 PM |
[Stabilization and Improvement of 33kV Lines of District Pulwama and Shopian of STD Pulwama]
[STD/PUL/11 OF 2024-25 DATED 15-10-2024][2024_PDD_260304_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||STD-Pulwama |
400 |
16-Oct-2024 10:00 AM |
06-Nov-2024 04:00 PM |
07-Nov-2024 02:00 PM |
[Supply and Erection of Galvanized]
[ TLMD-7/ TS/ 03 of 2024][2024_PDD_260386_1]
|
DC-PDD||CE-S and O Wing Kashmir |
401 |
15-Oct-2024 06:00 PM |
05-Nov-2024 02:00 PM |
06-Nov-2024 01:00 PM |
[Installation of 05 No. LT Poles with conductor for GHSS Khalpora Payeen and HS Kanhama]
[E-NIT No.SSDT/15 of 2024-25,Dated 15/10/2024][2024_PDD_260291_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
402 |
15-Oct-2024 06:00 PM |
05-Nov-2024 02:00 PM |
06-Nov-2024 01:00 PM |
[Installation of Electric Poles only Without wire and other equipments]
[E-NIT No.SSDT/19 of 2024-25,Dated 15/10/2024][2024_PDD_260342_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
403 |
15-Oct-2024 06:00 PM |
05-Nov-2024 02:00 PM |
06-Nov-2024 01:00 PM |
[Installation of LT poles at NEWRAN CHUKER B]
[E-NIT No.SSDT/18 of 2024-25,Dated 15/10/2024][2024_PDD_260333_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
404 |
15-Oct-2024 06:00 PM |
05-Nov-2024 02:00 PM |
06-Nov-2024 01:00 PM |
[Installation of LT poles at Kralpora Block Wailoo]
[E-NIT No.SSDT/16 of 2024-25,Dated 15/10/2024][2024_PDD_260312_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
405 |
15-Oct-2024 06:00 PM |
05-Nov-2024 02:00 PM |
06-Nov-2024 01:00 PM |
[Installation of LT poles at Chukar A]
[E-NIT No.SSDT/17 of 2024-25,Dated 15/10/2024][2024_PDD_260322_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
406 |
15-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Augmentation of Substation from 63KVA to 100KVA near Masjid Shareef Bon Khrewan and at Astan Mohalla Arreh, Replacement of 2NO. of 100 KVA Beigh Pora and Sheikh Pora sub stations by level 2 at village Ahmadabad under District Capex Budget DDC Grants ]
[EDK/e-tender/17 of 2024-25][2024_PDD_260259_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
407 |
15-Oct-2024 04:30 PM |
05-Nov-2024 04:00 PM |
06-Nov-2024 01:00 PM |
[Improvement of LT Poles at Haloora Gund A.]
[EDG/V/073 OF 2024-25][2024_PDD_260314_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
408 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[Creation of100 KVA transformer at Ramzanpora ,Check Khaitangan with Improvement of LT Network]
[EDB/67][2024_PDD_260168_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
409 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[Procurement of Transformers 63KV and 100Kv for Buffer Stock Bijhama)]
[EDB/68][2024_PDD_260182_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
410 |
15-Oct-2024 04:00 PM |
31-Oct-2024 04:00 PM |
02-Nov-2024 02:00 PM |
[Improvement of LT network at Baba Mazar ]
[EDIV/29 of 2024-25][2024_PDD_260166_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal |
411 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[Installation of electric poles with wire from h/o sulander singh to onwards near public school at qalampora]
[EDB/66][2024_PDD_260165_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
412 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[ Creation of63 kv transformer Ahanger mohalla lachipora ward no 01]
[EDB/69][2024_PDD_260197_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
413 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[ Creation of63 kv transformer Ahanger mohalla Noorkhah ward no 01 under DDC2024-25]
[EDB/70][2024_PDD_260206_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
414 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[ Creation of63 kv transformer Hundi nowshera ward No 03under DDC2024-25]
[EDB/71][2024_PDD_260218_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
415 |
15-Oct-2024 04:00 PM |
05-Nov-2024 04:00 PM |
06-Nov-2024 01:00 PM |
[Additional Work of 63 KVA transformer at Pathabal Rayil]
[EDG/V/072 OF 2024-25][2024_PDD_260293_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
416 |
15-Oct-2024 04:00 PM |
05-Nov-2024 04:00 PM |
06-Nov-2024 01:00 PM |
[Creation of 63 KVA 11/66.6KV Substation for Providing of Power Supply to IIM Jammu at Srinagar Athwajan]
[E NIT NO 041 OF ED-I][2024_PDD_260263_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
417 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[Installation of Transformer along with accessories at Chan Mohalla Wagoora ]
[EDB/65][2024_PDD_260161_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
418 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[Providing of new level 2 transformer atWar Mohalla Bulgam]
[EDB/64][2024_PDD_260158_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
419 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[Providing of new level 2 transformer at Bukhari Mohalla Chandkote]
[EDB/63][2024_PDD_260146_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
420 |
15-Oct-2024 04:00 PM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[Provision for transformers (Buffer stock) for Block Rohama Provision for transformers (Buffer stock) for Block Rohama ]
[EDB/62][2024_PDD_260139_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
421 |
15-Oct-2024 03:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 02:00 PM |
[Housekeeping, cleaning and maintenance of Data Center, IT Office SCADA Building and electric sub-station at PDD Complex Bemina Srinagar]
[CEOITC 11 of 2024][2024_PDD_260234_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
422 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Improvement of LT Network ( Pattan constituency) Under DDC Grants 2024-25]
[EMDS/148][2024_PDD_258608_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
423 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation of 100 KVA Transformer near H/O Mushtaq Ahmad Paray (Block Pattan PH Palhalan) Under DDC Grants 2024-25]
[EMDS/127][2024_PDD_258634_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
424 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[ HT poles with wirs at gundi ibrahim-A Under PRI Grants 2024-25]
[EMDS/91][2024_PDD_258555_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
425 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation/Augmentation of feasible sub stations Part 4( Creation of 63 kVA substation at Ganiepora Burn) under UT Capex 2024-25]
[EMDS/159][2024_PDD_258549_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
426 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation/Augmentation of feasible sub stations Part 5( Creation of 100 kVA substation at Sidiq Colony Botingoo) under UT Capex 2024-26]
[EMDS/160][2024_PDD_258547_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
427 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Installation of elevtric poles AND conductors at Mirgund -B Under PRI Grants 2024-25]
[EMDS/93][2024_PDD_258558_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
428 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation of 63 KVA Sub Station at Wani Har Mohalla near Masjid Asha at Botingoo. Under DDC Grants 2024-25]
[EMDS/146][2024_PDD_258893_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
429 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation/Augmentation of feasible sub stations Part 3( Creation of 100 kVA substation at Daruloom Colony Sangrama) under UT Capex 2024-25]
[EMDS/158][2024_PDD_258587_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
430 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation/Augmentation of feasible sub stations Part 1( Augmentation of 25 kVA to 63 kVA transformer at Baghi Rehmat on Court Road feeder) under UT Capex 2024-25]
[EMDS/156][2024_PDD_258659_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
431 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation/Augmentation of feasible sub stations Part 2( Upgradation of 25 kVA transformer to 100 kVA at Chatlora) under UT Capex 2024-25]
[EMDS/157][2024_PDD_258627_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
432 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[creation of 63KVA transformer at Chinar Colony Kanloo Mamoosa Under DDC Grants 2024-25]
[EMDS/147][2024_PDD_258615_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
433 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation of 63 KVA Sub Station at Eidgah Mohalla Qaziabad Pethbugh. Under DDC Grants 2024-25]
[EMDS/140][2024_PDD_258635_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
434 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Replacement of worn out conductor and rotten poles (within the Jurisdiction of ED Sopore) under UT Capex 2024-25]
[EMDS/161][2024_PDD_260105_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
435 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Improvement of HT/LT network (within the Jurisdiction of ED Sopore) under UT Capex 2024-25]
[EMDS/155][2024_PDD_260104_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
436 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Improvement of LT/HT for DDC constituency Tujar Under DDC Grants 2024-25]
[EMDS/135][2024_PDD_258630_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
437 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation of 63 KVA Transformer for Lone Mohalla near Dhobi Mohalla Zaloora Under DDC Grants 2024-25]
[EMDS/134][2024_PDD_258629_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
438 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation of 63 KVA transformer at Ummarabad Dardpora Under DDC Grants 2024-25]
[EMDS/136][2024_PDD_258631_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
439 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation of 63 KVA Transformer at Danger Mohalla Latishot near H/O Habibullah Pir Under DDC Grants 2024-25]
[EMDS/137][2024_PDD_258632_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
440 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation of 64 KVA Transformer at Dhoni Mohalla Dardpora Under DDC Grants 2024-25]
[EMDS/138][2024_PDD_258633_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
441 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Procurement of Electric Poles Under DDC Grants 2024-25]
[EMDS/150][2024_PDD_258662_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
442 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Improvement of LT/HT Net work at Block Zaingeer. Under DDC Grants 2024-25]
[EMDS/144][2024_PDD_258660_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
443 |
15-Oct-2024 01:00 PM |
07-Nov-2024 04:00 PM |
09-Nov-2024 02:00 PM |
[Creation of 63 KVA Sub Station at Sidiq Coloney Warapora near Market. Under DDC Grants 2024-25]
[EMDS/142][2024_PDD_258658_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
444 |
15-Oct-2024 10:00 AM |
05-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Charging of 63/25 kVA sub-stations installed by M/S EMC on feeder no. 03 and 04 emanating from Receiving Station Zainakote under Capex Budget 2024-25 Work Code PDDSS2324100142 falling under the jurisdiction of ESD Zainakote, ED-3rd (Turnkey Basis)]
[ED-III /18 of 2024-25, Dated- 15/10/2024][2024_PDD_259888_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
445 |
14-Oct-2024 06:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 02:30 PM |
[Execution of various Power Distribution Network works under DDC Scheme 2024-2025 on Turnkey basis]
[EDV/ 27 of 2024-2025 Dated 14-10-2024][2024_PDD_260015_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Vijaypur |
446 |
14-Oct-2024 05:30 PM |
06-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[Supply, Installation, testing and commissioning (SITC) of CTs and meters for Auxiliary feeder at 480MVA 220/132/33kV GSS Delina]
[TLMD-VI/06 OF 2024-25 DATED 14-10-2024][2024_PDD_260057_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-I Srinagar |
447 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Replacement of Worn Out Conductor and rotten poles HT stabilization at nehalpora Feeder and LT Stabilization at Resray Pora ]
[E-NIT No.SSDT/14 of 2024-25,Dated 14/10/2024][2024_PDD_260042_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
448 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Installation of transformer at Wanpora Bhat Mohalla Sallar B]
[EDB/e-tender/ 57 of 2024-25][2024_PDD_260005_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
449 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Installation of 63Kv transformer at with poles and wire at Zaigund Sallar B]
[EDB/e-tender/ 57 of 2024-25][2024_PDD_259995_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
450 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Replacement of wornout conductor and rotten poles at Nooripora]
[E-NIT No.SSDT/14 of 2024-25,Dated 14/10/2024][2024_PDD_260042_5]
|
DC-PDD||CE-M and RE Wing Kashmir |
451 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Replacement of wornout conductor and rotten poles at Malwa]
[E-NIT No.SSDT/14 of 2024-25,Dated 14/10/2024][2024_PDD_260042_3]
|
DC-PDD||CE-M and RE Wing Kashmir |
452 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Replacement of Worn Out Conductor and rotten poles HT stabilization at Batpora Feeder]
[E-NIT No.SSDT/14 of 2024-25,Dated 14/10/2024][2024_PDD_260042_2]
|
DC-PDD||CE-M and RE Wing Kashmir |
453 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Replacement of wornout conductor and rotten poles at Ogmuna (Under UT CAPEX BUDGERT -2024-25)]
[E-NIT No.SSDT/14 of 2024-25,Dated 14/10/2024][2024_PDD_260042_4]
|
DC-PDD||CE-M and RE Wing Kashmir |
454 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Upgradation of Level 2 Transformer at Sheikh Mohalla Katsoo ward 5]
[EDB/e-tender/ 57 of 2024-25][2024_PDD_259935_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
455 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Augmentation of 25 Kva to 63 Kva at Purni Sudershah]
[E-NIT No.SSDT/13 of 2024-25,Dated 14/10/2024][2024_PDD_259946_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
456 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Augmentation of 100 Kva to 200 Kva at Shed Mohalla Shouch Palpora]
[E-NIT No.SSDT/12 of 2024-25,Dated 14/10/2024][2024_PDD_259930_2]
|
DC-PDD||CE-M and RE Wing Kashmir |
457 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Creation of 63 Kva Substation along with HTLT Network at Rather Mohalla Guiwa]
[E-NIT No.SSDT/12 of 2024-25,Dated 14/10/2024][2024_PDD_259930_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
458 |
14-Oct-2024 05:00 PM |
04-Nov-2024 12:00 PM |
06-Nov-2024 12:00 PM |
[Labour Rate Contract for the Financial Year 2024-25 for Material Handling Job and Allied Works]
[ECSD/JPDCL/JMU/02 of 2024-25 Dated 14.10.2024][2024_PDD_259924_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
459 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Construction of Cabin Room inside workshop building of size 9.5x7.5 feet]
[EDB/e-tender/ 56 of 2024-25 ][2024_PDD_259911_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
460 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Augmentation of 100 Kva to 200 Kva at Shah Mohalla Batpora ]
[E-NIT No.SSDT/13 of 2024-25,Dated 14/10/2024][2024_PDD_259946_3]
|
DC-PDD||CE-M and RE Wing Kashmir |
461 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Installation of transformer with wire and poles at Bagandar Sallar A]
[EDB/e-tender/ 57 of 2024-25][2024_PDD_259983_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
462 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Installation of Transformer with wire and Poles at Sehgund New Colony Sallar A]
[EDB/e-tender/ 57 of 2024-25][2024_PDD_259977_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
463 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Installation of 63 KV Transformer at Dal Colony Mahind]
[EDB/e-tender/ 57 of 2024-25 ][2024_PDD_259963_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
464 |
14-Oct-2024 05:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 12:00 PM |
[Augmentation of 63 Kva to 100 Kva at Dar Mohalla Kwarhama ]
[E-NIT No.SSDT/13 of 2024-25,Dated 14/10/2024][2024_PDD_259946_2]
|
DC-PDD||CE-M and RE Wing Kashmir |
465 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Installation of 63 KVA Transformer NHO Ab Hamid Rather and Gh Rasool Khan at Bonpora Mahind]
[EDB/e-tender/ 57 of 2024-25][2024_PDD_259950_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
466 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Construction of Reinforced Cement Concrete Path Ramp from Main Gate to Repairing Hall of Divisional Workshop and Platform for stocking of transformers at Electric Division Bijbehara]
[EDB/e-tender/ 56 of 2024-25][2024_PDD_259873_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
467 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Maintenance Procurement of workshop Machinery]
[EDB/e-tender/ 56 of 2024-25][2024_PDD_259862_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
468 |
14-Oct-2024 05:00 PM |
01-Nov-2024 01:00 PM |
02-Nov-2024 01:00 PM |
[Installation of Entrance Gate to Transformer workshop 15x14 at ED Bijbehara]
[EDB/e-tender/ 56 of 2024-25][2024_PDD_259857_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Bijbehara |
469 |
14-Oct-2024 04:00 PM |
05-Nov-2024 02:00 PM |
07-Nov-2024 12:00 PM |
[KED/85 of 2024-25 Dated 14.10.2024 ]
[KED/85 of 2024-25 Dated 14.10.2024 ][2024_PDD_260017_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Kathua |
470 |
14-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 01:00 PM |
[Improvement of LT Poles with wiring at Chattergul A Gasul Ward No 4.]
[EDG/V/071 OF 2024-25][2024_PDD_260031_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
471 |
14-Oct-2024 04:00 PM |
04-Nov-2024 04:00 PM |
05-Nov-2024 01:00 PM |
[Improvement of LT Poles with wiring at DDC Constituency Kangan C.]
[EDG/V/070 OF 2024-25][2024_PDD_260009_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
472 |
14-Oct-2024 04:00 PM |
30-Oct-2024 04:30 PM |
31-Oct-2024 10:30 AM |
[AMRC for SITC of Different Materials, Accessories and Items etc for Upkeepment of Electrical Network, LT/HT Protections, Maintt of Sub-Stn, DG Sets, Control Room for ensuring smooth functioning of New Civil Sectt, Sgr for period w.e.f Nov24 to Oct25]
[ED-II/11 of 2024-25 Dated 14/10/24][2024_PDD_260006_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
473 |
14-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 03:00 PM |
[PROVIDING OF COMMERCIAL VEHICLES ON DAILY BASIS ALONG WITH DRIVER ON HIRE BASIS ]
[STDS/08 of 2024-25][2024_PDD_260010_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||STD-Sopore |
474 |
14-Oct-2024 04:00 PM |
04-Nov-2024 11:00 AM |
04-Nov-2024 02:00 PM |
[UPGRADATION OF POWER INFRASTRUCTURE (LT NETWORK ) AT VARIOUS LOCATIONS/PYT. HALQAS / BLOCKS IN THE JURISDICTION OF KPDCL SUB DIVISION CHITRAGAM UNDER PRI GRANTS FOR THE FY.2024-25]
[EDS/E-TENDER/16 OF 2024 DATED 14-10-2024][2024_PDD_259993_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||ED-Shopian |
475 |
14-Oct-2024 04:00 PM |
05-Nov-2024 02:00 PM |
07-Nov-2024 12:00 PM |
[KED/84 of 2024-25 Dated 14.10.2024 for Augmentation of 20Nos. Sub Stations from 100KVA to 250KVA at various locations of Sub Division Hiranagar of Electric Division, JPDCL Kathua under UT CAPEX Budget 2024-25]
[KED/84 of 2024-25 Dated 14.10.2024 ][2024_PDD_259996_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Kathua |
476 |
14-Oct-2024 04:00 PM |
04-Nov-2024 03:00 PM |
05-Nov-2024 03:00 PM |
[Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for i Creation of 25 KVA S.S alongwith HT.LT network at New BDC Building ser Pyt. Jaganoo Block Jaganoo ii. Electric poles at different pyts. of Block Majalta under BDC ]
[ED/Udh/13A of 2024-25 dt. 14-10-2024][2024_PDD_259932_1]
|
DC-PDD||CE-M and RE Wing Jammu||Batote||ED-Udhampur |
477 |
14-Oct-2024 02:00 PM |
02-Nov-2024 02:00 PM |
04-Nov-2024 02:00 PM |
[LT extension for Electrification of Goat Farm Arin Dardpora Bandipora ]
[EDBpr 10 of 2024-25][2024_PDD_259889_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||ED-Bandipora |
478 |
14-Oct-2024 01:00 PM |
05-Nov-2024 12:00 PM |
06-Nov-2024 02:00 PM |
[Carrying out Preventive / Routine/Breakdown Maintenance of 220/132/33kV and 132/33kV Grid sub Stations viz-Delina, GIS-Tengpora, Kulgam, Mattan .]
[TLMD-VI/05 OF 2024-25 DATED 14-10-2024][2024_PDD_259832_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-I Srinagar |
479 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of HT/ LT Network in different villages of Block Pattan Under DDC Grants 2024-25]
[EMDS/129][2024_PDD_258623_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
480 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[mprovement of HT/ LT Network in different villages of Block Pattan (Block Pattan PH Palhalan) Under DDC Grants 2024-25]
[EMDS/128][2024_PDD_258622_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
481 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Installation of 63 KVA Transformer near SKUAST at Wadoora Payeen Under PRI Grants 2024-25]
[EMDS/122][2024_PDD_258616_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
482 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Creation of Transformer at Malikpora Wanigam Bala Under DDC Grants 2024-25]
[EMDS/124][2024_PDD_258618_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
483 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of LT Network at Magraypora Hathlangoo Under PRI Grants 2024-25]
[EMDS/108][2024_PDD_258601_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
484 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Installation of HT/LT of electric poles ar Trikobal. Under PRI Grants 2024-25]
[EMDS/120][2024_PDD_258614_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
485 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Creation of 100 KVA Tranformer at Pet Mohalla Wanigam Payeen Under DDC Grants 2024-25]
[EMDS/125][2024_PDD_258619_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
486 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Creation of 63 KVA Tranformer at New Colony Batpora Tapper Waripora Under DDC Grants 2024-25]
[EMDS/126][2024_PDD_258620_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
487 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Imprvement of HT/LT network with installtion of 63 kv transformer near Play ground Baghat Colony Gund Brath Under PRI Grants 2024-25]
[EMDS/107][2024_PDD_258600_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
488 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of LT Network at PH Malmapanpopra Under PRI Grants 2024-25]
[EMDS/109][2024_PDD_258602_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
489 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of LT/HT network at PH Watlab Under PRI Grants 2024-25]
[EMDS/115][2024_PDD_258609_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
490 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of LT network in Panchayat Shiva A Under PRI Grants 2024-25]
[EMDS/111][2024_PDD_258605_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
491 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of HT/LT network at Shiva B Under PRI Grants 2024-25]
[EMDS/112][2024_PDD_258606_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
492 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of HT/LT Network at Brath kalan Under PRI Grants 2024-25]
[EMDS/104][2024_PDD_258593_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
493 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of LT nerwork at PH Botingoo B Under PRI Grants 2024-25]
[EMDS/103][2024_PDD_258591_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
494 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Installation of LT Poles Near Masjid Bilal at Chinad Under PRI Grants 2024-25]
[EMDS/101][2024_PDD_258589_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
495 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of HT/LT network from H/o Sonaullah Ganai to Mukhtar Ganai and Farooq Mir at Duroo A Under PRI Grants 2024-25]
[EMDS/105][2024_PDD_258594_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
496 |
14-Oct-2024 01:00 PM |
06-Nov-2024 04:00 PM |
08-Nov-2024 02:00 PM |
[Improvement of HT/LT network at Mundji Under PRI Grants 2024-25]
[EMDS/110][2024_PDD_258603_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
497 |
14-Oct-2024 12:00 PM |
05-Nov-2024 12:00 PM |
05-Nov-2024 02:00 PM |
[Annual Rate Contract for Carrying out Preventive / Routine / Breakdown Maintenance of 220kV and 132kV Transmission Lines for the year 2024 25]
[TLMDVI/04 OF 202425 DATED 11/10/2024][2024_PDD_259520_1]
|
DC-PDD||CE-S and O Wing Kashmir||CIRCLE I-Srinagar||TLMD-I Srinagar |
498 |
14-Oct-2024 11:00 AM |
04-Nov-2024 02:30 PM |
05-Nov-2024 02:30 PM |
[Balance work for completion of 1x6.3MVA receiving station Charangam]
[eNIT No STD-II /24 of 2024-25 Dated 10/10/2024][2024_PDD_259065_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
499 |
14-Oct-2024 10:00 AM |
30-Oct-2024 02:00 PM |
31-Oct-2024 03:00 PM |
[Temporarily shifting and permanent raising of 33kV Delina Sopore line near Lalad Amargarh for giving way to construction of Entry Gate at Lalad]
[STDS/07 of 2024-25][2024_PDD_259779_1]
|
DC-PDD||CE-M and RE Wing Kashmir||North Sopore||STD-Sopore |
500 |
14-Oct-2024 09:00 AM |
06-Nov-2024 09:00 AM |
08-Nov-2024 09:00 AM |
[Creation of 100 kv transformer at Mustafabad Warpora A Under PRI Grants 2024-25]
[EMDS/113][2024_PDD_258607_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
501 |
12-Oct-2024 06:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:30 PM |
[REPLACEMENT OF OLD AND LOWER RATIO 03 SETS OF 33 KV CTS 01 NO 132 KV SF6 BREAKER BY NEW ONE AT GSS ARAMPORA AND REPLACEMENT OF 03 NO OLD VCBS BY NEW ONE AT GSS AMARGARH]
[EE/TLMDA/02 OF 2024][2024_PDD_259656_1]
|
DC-PDD||CE-S and O Wing Kashmir |
502 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Installation of 63 KV Transformer at Mir Mohalla Buchoo Under PRI]
[EDB/52][2024_PDD_259627_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
503 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[Improvement of LT Network at halqa Buchoo Under PRI]
[EDB/53][2024_PDD_259628_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
504 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Upgradations of transformer from 63 kv to 100 kv at Bag Mohalla ward No 07 Dawaran Under PRI]
[EDB/50][2024_PDD_259624_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
505 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[Creating infrastrructure for laying of electric line upper dachi ward 06]
[EDB/51][2024_PDD_259626_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
506 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[Improvement of Power Infrastructure at Panchayat Halqa Saripara Under PRI]
[EDB/54][2024_PDD_259630_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
507 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Creation of100 KVA Sub Station with allied HT/LT Network at Baghpora Chijhama Under PRI]
[EDB/56][2024_PDD_259632_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
508 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Creation of100 KVA Sub Station with Poles at Bhat Mohalla Ladu Under PRI]
[EDB/57][2024_PDD_259634_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
509 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Creation of100 KVA Sub Station with allied HT/LT Network at Syed Karim Chijhama Under PRI]
[EDB/55][2024_PDD_259631_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
510 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[Creation of100 KVA Sub Station with Allied HT and LT Net Work at Road Mohalla Wanpora Under PRI]
[EDB/61][2024_PDD_259645_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
511 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Creation of63 Kva Sub Station with allied HT LT Network at Mir Mohalla Shutloo Under PRI]
[EDB/60][2024_PDD_259641_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
512 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[Improvement / Stabilization of HT Network of 11 Kv Shutloo Feeder Under PRI]
[EDB/59][2024_PDD_259638_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
513 |
12-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[Improvement / Stabilization of HT Network of 11Kv Panzalla Feeder Under PRI]
[EDB/58][2024_PDD_259636_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
514 |
12-Oct-2024 10:00 AM |
31-Oct-2024 04:00 PM |
01-Nov-2024 02:00 PM |
[Shifting of utilities of comprehensive sewerage scheme in Zone IIIrd of Greater Srinagar falling under the jurisdiction of ESD Nawakadal, ED-3rd (Turnkey Basis)]
[ED-III /17 of 2024-25, Dated - 12/10/2024][2024_PDD_259249_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
515 |
12-Oct-2024 09:00 AM |
02-Nov-2024 02:00 PM |
04-Nov-2024 02:00 PM |
[Purchase of ST poles of various sizes]
[SE/Proc/06 of 2024-25][2024_PDD_259519_1]
|
DC-PDD||CE-M and RE Wing Kashmir||CIRCLE II-Srinagar |
516 |
11-Oct-2024 06:00 PM |
31-Oct-2024 04:00 PM |
02-Nov-2024 02:30 PM |
[Supply Erection, Testing and Commissioning of 63 KVA Sub Stations along with HT/LT Line at Village (Mawa, Sanoora and Sarthi Kalan/ Chelari Khurd/Upper Dabri, Pyt. Goran ) and Shifting of 11 KV Line at Village (Mawa , Sarthi Kalan) under ABDP]
[EDV/ 26 of 2024-2025 Dated 11-10-2024][2024_PDD_259359_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Vijaypur |
517 |
11-Oct-2024 06:00 PM |
31-Oct-2024 04:00 PM |
02-Nov-2024 02:30 PM |
[Creation of 100 KVA Sub-Station alongwith laying of HT on 9 Mtr PCC Poles and LT on 8 Mtr PCC Poles using ACSR Weasel conductor under SSY Scheme 2024-25 in Village Barota Camp of Ramgarh]
[EDV/ 25 of 2024-2025 Dated 11-10-2024][2024_PDD_259351_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Vijaypur |
518 |
11-Oct-2024 06:00 PM |
04-Nov-2024 02:30 PM |
05-Nov-2024 02:30 PM |
[Annual rate contract for Handling of Power Transformers for the year 24-25 or till next rate contract]
[eNIT No STD-II /25 of 2024-25 Dated 11/10/2024][2024_PDD_259424_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
519 |
11-Oct-2024 06:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:30 PM |
[REPLACEMENT OF OLD AND LOWER RATIO 02 SETS OF 33 KV CTS 03 NO OF OLD VCBS AND 01 NO BATTERY CHARGER BY NEW ONE AT GSS MAGAM]
[EE/TLMDA/01 OF 2024][2024_PDD_259455_1]
|
DC-PDD||CE-S and O Wing Kashmir |
520 |
11-Oct-2024 05:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 12:00 PM |
[Creation of 100 Kva Substation along with HTLT Network at Kaka Pora Khore SHerabad Under UT CAPEX BUDGET 2024-25]
[E-NIT No.SSDT/10 of 2024-25,Dated 11/10/2024][2024_PDD_259463_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
521 |
11-Oct-2024 05:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 12:00 PM |
[Improvement of LT Network at Hajam Mohalla and New Colony Nadirgund]
[E-NIT No.SSDT 08 of 2024-25,Dated 11/10/2024][2024_PDD_259308_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
522 |
11-Oct-2024 05:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 12:00 PM |
[Improvement of LT Network at Ahanger Mohalla Khaipora Bala]
[E-NIT No.SSDT 08 of 2024-25,Dated 11/10/2024][2024_PDD_259308_2]
|
DC-PDD||CE-M and RE Wing Kashmir |
523 |
11-Oct-2024 05:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 12:00 PM |
[RandM of 250 Kva Sub station at Nooripora, 250 Kva Sub station at Ahangar Mohalla Khasipora Khore, 100 Kva Sub station at New Colony Check Seri, 100 Kva Sub station at Kungamdara Check and 100 Kva Sub station at Khurd Mohalla Check Sari]
[E-NIT No.SSDT 09 of 2024-25,Dated 11/10/2024][2024_PDD_259326_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
524 |
11-Oct-2024 05:00 PM |
02-Nov-2024 03:00 PM |
04-Nov-2024 12:00 PM |
[Creation of 100 Kva Substation along with HTLT Network at New Colony Sunny Mohalla Yall Kunzer]
[E-NIT No.SSDT/11 of 2024-25,Dated 11/10/2024][2024_PDD_259484_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
525 |
11-Oct-2024 04:00 PM |
02-Nov-2024 02:00 PM |
04-Nov-2024 12:00 PM |
[KED/83 of 2024-25 Dated 11.10.2024 for Shifting of Electric Utilities from Bani to Basohli-Bani Road 70.00 to 89.00Km in respect of JPDCL Electric Division Kathua on Turnkey Basis]
[KED/83 of 2024-25 Dated 11.10.2024 ][2024_PDD_259348_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Kathua |
526 |
11-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Creation of63KVA Substation with Allied network at Baghat Sadipora and HT/LT improvement of existing network Under PRI]
[EDB/46][2024_PDD_259375_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
527 |
11-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Creation of63 KVA Substation with allied Network upto Kumar Mohalla tangmulla Under PRI]
[EDB/45][2024_PDD_259371_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
528 |
11-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[Augmentation of Substation from 100 KVA to 100 KVA L2 with R M of S StN and LT improvement of wani mohalla Vohlutra Under PRI]
[EDB/47][2024_PDD_259381_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
529 |
11-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Installation of 63 KVA Electric Transformer at Beebnar Mohalla Malpora Under PRI]
[EDB/49][2024_PDD_259436_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
530 |
11-Oct-2024 04:00 PM |
02-Nov-2024 02:00 PM |
04-Nov-2024 02:00 PM |
[ Purchase of Fully automatic Van mounted Cable Fault Locator up to 33 kV level.]
[SE/PROC/04of 2024-25][2024_PDD_259398_1]
|
DC-PDD||CE-M and RE Wing Kashmir||CIRCLE II-Srinagar |
531 |
11-Oct-2024 04:00 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[ Creation of63KVA substation with allied LT/HT network in shumriyal Vohlutra Under PRI]
[EDB/48][2024_PDD_259395_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
532 |
11-Oct-2024 02:00 PM |
31-Oct-2024 03:00 PM |
01-Nov-2024 02:00 PM |
[Replacement of old outdated 11 kv VCB panels ]
[STD/PUL/10 OF 2024-25 DATED 11/10/2024][2024_PDD_259277_1]
|
DC-PDD||CE-M and RE Wing Kashmir||South Pulwama||STD-Pulwama |
533 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Improvement of LT network at Hajam Mohalla Behrampora-A Under PRI Grants 2024-25]
[EMDS/79][2024_PDD_258543_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
534 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Improvement of HT/LT Network at Behrampora-B Under PRI Grants 2024-25]
[EMDS/80][2024_PDD_258544_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
535 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Installation of 63-KV transformer at Parr Mohalla Takiya Tapper Under PRI Grants 2024-25]
[EMDS/72][2024_PDD_258532_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
536 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Installation of 63 KVTransformer at Sideeq Mohalla Pethpora Wanigam Bala Under PRI Grants 2024-25]
[EMDS/77][2024_PDD_258541_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
537 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Installation of 2 NO 63 KV transformer at kumar mohalla and Mohalla pethpora at wanigam Payeen-B Under PRI Grants 2024-25]
[EMDS/75][2024_PDD_258538_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
538 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Installation of electric poles and conductors of Mirgund-A Under PRI Grants 2024-25]
[EMDS/92][2024_PDD_258556_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
539 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Wussan B Under PRI Grants 2024-25]
[EMDS/78][2024_PDD_258542_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
540 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Installation of 63 K with wire at yakmanpora. Under PRI Grants 2024-25]
[EMDS/90][2024_PDD_258554_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
541 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Installation of electric poles with wiring at arampora. Under PRI Grants 2024-25]
[EMDS/89][2024_PDD_258553_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
542 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Improvement of LT Network at Chatloora Under PRI Grants 2024-25]
[EMDS/81][2024_PDD_258545_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
543 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Takiya Tapper 5 No. Poles at Bag-E- Wali Shah and at other spots Under PRI Grants 2024-25]
[EMDS/71][2024_PDD_258530_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
544 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Installation of 100kva transformer with 6 No. of HT Poles and Conductor to PHC Mohalla near Imam Bargah Hussanie Hall Kanterbugh at GK Qasim Under PRI Grants 2024-25]
[EMDS/88][2024_PDD_258552_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
545 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Improvement of LT network at Panchayat Halqa Hib Dangerpora Under PRI Grants 2024-25]
[EMDS/82][2024_PDD_258546_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
546 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[I/o HT/LT network at Shangergund/Bohripora Under PRI Grants 2024-25]
[EMDS/96][2024_PDD_258584_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
547 |
11-Oct-2024 01:00 PM |
04-Nov-2024 04:00 PM |
06-Nov-2024 02:00 PM |
[Creation of 63 KVA sub station with LT Improvement at Gulab Bagh colony Seeloo Under PRI Grants 2024-25]
[EMDS/95][2024_PDD_258583_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
548 |
11-Oct-2024 09:00 AM |
07-Nov-2024 02:00 PM |
09-Nov-2024 02:00 PM |
[Purcahse of Three Phase Oil Immersed 11kV 433 250v Copper Wound Distribution Transformer of ratings 630kVA and Aluminium Wound 100 KVA and 25 kVA ]
[SE/Proc/05/2024-25][2024_PDD_259078_1]
|
DC-PDD||CE-M and RE Wing Kashmir||CIRCLE II-Srinagar |
549 |
10-Oct-2024 06:55 PM |
30-Oct-2024 04:00 PM |
31-Oct-2024 02:30 PM |
[CREATION OF SUB STATION (25/63 KVA) ALONG WITH HT/LT LINE ON TURNKEY BASIS UNDER PRI WORK 2024-2025]
[EDV/ 24 of 2024-2025 Dated 10-10-2024][2024_PDD_259118_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Vijaypur |
550 |
10-Oct-2024 06:00 PM |
12-Nov-2024 03:00 PM |
13-Nov-2024 02:00 PM |
[Shifting /Crossing of HT/LT lines at various locations on Baili Nallah Bundh under Pargwal Sub Sector of Indian Army, falling under the jurisdiction of Electric Sub Division Janipur on Turnkey basis.]
[ ED-III/Jammu/43 of 2024-25 ][2024_PDD_259108_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-III Jammu |
551 |
10-Oct-2024 04:35 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[Supply, Erection, Testing, Commissioning for Creation of 100 KVA Sub-Station alongwith laying of HT AB Cable at Slaughter House Dogra Hall, Jammu under the Jurisdiction of Electric Division Div-I (JPDCL) Jammu on Turn Key Basis]
[ED-I/e-NIT/30 of 2024-25 Dated 10/10/2024][2024_PDD_259121_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-I Jammu |
552 |
10-Oct-2024 04:30 PM |
30-Oct-2024 02:00 PM |
31-Oct-2024 02:00 PM |
[Supply, Erection, Testing, Commissioning for Creation of 100 KVA Sub-Station alongwith laying of HT XLPE Cable 120 mm sq 3 Core and LT AB Cable 120 mm sq 3 Core for modernization of Slaughter Houses at Gujjar Nagar, Jammu under ED-I Jammu]
[ED-I/e-NIT/31 of 2024-25 Dated 10/10/2024][2024_PDD_259124_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-I Jammu |
553 |
10-Oct-2024 04:00 PM |
30-Oct-2024 04:00 PM |
31-Oct-2024 01:00 PM |
[Improvement of LT Poles at Zerpora Kullan-B.]
[EDG/V/066 OF 2024-25][2024_PDD_259049_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
554 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Palhallan H Under PRI Grants 2024-25]
[EMDS/66][2024_PDD_258514_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
555 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT network at Tapper Waripora Under PRI Grants 2024-25]
[EMDS/70][2024_PDD_258529_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
556 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Sultanpora A Under PRI Grants 2024-25]
[EMDS/67][2024_PDD_258516_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
557 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Dargam Under PRI Grants 2024-25]
[EMDS/51][2024_PDD_257134_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
558 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Installation of Poles with Wire and other Items at Andergam Under PRI Grants 2024-25]
[EMDS/55][2024_PDD_258502_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
559 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Installation of 100 KV Transformer at Malpora Buran Zangam-a Under PRI Grants 2024-25]
[EMDS/50][2024_PDD_257130_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
560 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Goshbugh B Under PRI Grants 2024-25]
[EMDS/53][2024_PDD_257216_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
561 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Goshbugh A Under PRI Grants 2024-25]
[EMDS/52][2024_PDD_257213_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
562 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Palhallan G Under PRI Grants 2024-25]
[EMDS/65][2024_PDD_258513_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
563 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Loolipora Under PRI Grants 2024-25]
[EMDS/58][2024_PDD_258505_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
564 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Palhallan D Under PRI Grants 2024-25]
[EMDS/63][2024_PDD_258510_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
565 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Installation of electric poles and wires at village Khargam Under PRI Grants 2024-25]
[EMDS/48][2024_PDD_257126_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
566 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Sultanpora C Under PRI Grants 2024-25]
[EMDS/68][2024_PDD_258517_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
567 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Palhallan E Under PRI Grants 2024-25]
[EMDS/64][2024_PDD_258512_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
568 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Installation of 63 KV transformer near Hajam Mohalla Palhallan-A Under PRI Grants 2024-25]
[EMDS/62][2024_PDD_258509_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
569 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement Of LT/HT Network at Nehalpora B Under PRI Grants 2024-25]
[EMDS/60][2024_PDD_258507_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
570 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Installation of of 100KVA Transformer along wire AND Poles at Gundbal Halqa Andergam Under PRI Grants 2024-25]
[EMDS/56][2024_PDD_258503_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
571 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT netwrok at Hamray Under PRI Grants 2024-25]
[EMDS/54][2024_PDD_257221_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
572 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Installation of 63KVA Transformer at Sabir Colony near Masjid Rehamtan-lil-Aalmeen loolipora Under PRI Grants 2024-25]
[EMDS/59][2024_PDD_258506_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
573 |
10-Oct-2024 01:00 PM |
02-Nov-2024 04:00 PM |
04-Nov-2024 02:00 PM |
[Improvement of LT/HT Network at Sultanpora D Under PRI Grants 2024-25]
[EMDS/69][2024_PDD_258527_1]
|
DC-PDD||CE-M and RE Wing Kashmir |
574 |
10-Oct-2024 10:00 AM |
04-Nov-2024 02:00 PM |
05-Nov-2024 02:00 PM |
[Purchase of EHV Grade Transformer Oil Confirming to IS 335 -2018 ]
[SE/PROC/03 of 2024-25][2024_PDD_258912_1]
|
DC-PDD||CE-M and RE Wing Kashmir||CIRCLE II-Srinagar |
575 |
09-Oct-2024 06:00 PM |
11-Nov-2024 03:00 PM |
12-Nov-2024 02:00 PM |
[Re-alignment of 11KV line by way of Laying of 0.75Km 11KV line on 9 meter PCC poles using ACSR Rabbit of BH-4 feeder at RTO (Driving Institute) at Ghaink and Improvement/Repair of 400KVA Distribution Substn installed at Resi Qrtrs of BOSE Rehari]
[ ED-III/Jammu/41 of 2024-25 ][2024_PDD_258894_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-III Jammu |
576 |
09-Oct-2024 06:00 PM |
30-Oct-2024 03:00 PM |
31-Oct-2024 02:00 PM |
[Creation of 1x250 KVA Sub Station (1x250 KVA Sub Station at Krishi Bhawan Complex, Talab Tillo Jammu including laying of LT network on 8 meter PCC Poles using 120mm2 AB Cable for dispersal of power, under UT Capex, SD Canal]
[ED-III/Jammu/42 of 2024-25][2024_PDD_258900_1]
|
DC-PDD||CE-M and RE Wing Jammu||Jammu||ED-III Jammu |
577 |
09-Oct-2024 04:00 PM |
01-Nov-2024 02:00 PM |
02-Nov-2024 02:00 PM |
[Shifting of HT LT Wire over BDC Building Gund]
[STD GBL 12 OF 2024-25 Dated 09-12-2024][2024_PDD_258891_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||STD-Ganderbal |
578 |
09-Oct-2024 04:00 PM |
01-Nov-2024 02:00 PM |
02-Nov-2024 02:00 PM |
[Installation of Dedicated Essential feeder for WSS Regional Parihaspora under NRDWP JJM Construction of Gantry and Installation of VCB Panel at Rec.Stn Dab]
[STD GBL 11 of 2024-25 Dated 09-11-2024][2024_PDD_258822_1]
|
DC-PDD||CE-M and RE Wing Kashmir||Ganderbal||STD-Ganderbal |
579 |
09-Oct-2024 04:00 PM |
31-Oct-2024 02:00 PM |
02-Nov-2024 12:00 PM |
[KED/80 of 2024-25 Dated 09.10.2024 for Creation of 100KVA Sub Station alongwith HT/LT line at Chunnera under water Supply Scheme JJM (PHE) in respect of JPDCL Electric Sub Division Billawar of Electric Division Kathua on Turnkey Basis]
[KED/80 of 2024-25 Dated 09.10.2024 ][2024_PDD_258734_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Kathua |
580 |
09-Oct-2024 04:00 PM |
31-Oct-2024 02:00 PM |
02-Nov-2024 12:00 PM |
[KED/81 of 2024-25 Dated 09.10.2024 for Creation of 100KVA Sub Station alongwith HT/LT line at Najote under water Supply Scheme JJM (PHE) in respect of JPDCL Electric Sub Division Billawar of Electric Division Kathua on Turnkey Basis ]
[KED/81 of 2024-25 Dated 09.10.2024 ][2024_PDD_258841_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Kathua |
581 |
09-Oct-2024 04:00 PM |
31-Oct-2024 02:00 PM |
02-Nov-2024 12:00 PM |
[KED/82 of 2024-25 Dated 09.10.2024 for Providing of 11KV Dedicated Feeders from various 33/11KV Receiving station for power supply to International Border(BOPS) in Hiranagar Area by JPDCL, Jammu in respect of Elect. Div. Kathua on Turnkey Basis]
[KED/82 of 2024-25 Dated 09.10.2024 ][2024_PDD_258851_1]
|
DC-PDD||CE-M and RE Wing Jammu||Kathua||ED-Kathua |